Protection method for underground pipeline trough in building construction
The invention provides a protection method for an underground pipeline trough in building construction. The protection method comprises the following steps that S1, soil at the top of the pipeline trough is excavated for the first time, so that the whole top of the pipeline trough is exposed; S2, soil on the first side face of the pipeline trough is excavated for the second time, so that the wholefirst side face of the pipeline trough is exposed, and the first side face is the side face, close to a construction building, of the pipeline trough; S3, a cushion layer is mounted at the bottom ofthe position subjected to excavation for the second time; and S4, steel plate buried parts are pre-buried on the top and the first side face of the pipeline trough, concrete is poured, and an overallenclosure wall is formed. By means of the method, the pipeline trough can be protected against damage in building construction, and meanwhile stability and firmness of the pipeline trough are improved.
本发明提供了一种建筑施工中地下管线槽的保护方法,包括以下步骤:S1.在管线槽的顶部土方进行第一次开挖,以使所述管线槽顶部全部露出;S2.在所述管线槽的第一侧面处的土方进行第二次开挖,以使所述管线槽的第一侧面全部露出,所述第一侧面是指所述管线槽靠近施工建筑的侧面;S3.在所述第二次开挖处的底部安装一垫层;S4.在所述管线槽的顶部和所述第一侧面,预埋钢板埋件并浇筑混凝土,形成一个整体的围护墙。该方法可以保护管线槽在建筑施工中不被损坏,同时提高了管线槽的稳定性和牢固性。
Protection method for underground pipeline trough in building construction
The invention provides a protection method for an underground pipeline trough in building construction. The protection method comprises the following steps that S1, soil at the top of the pipeline trough is excavated for the first time, so that the whole top of the pipeline trough is exposed; S2, soil on the first side face of the pipeline trough is excavated for the second time, so that the wholefirst side face of the pipeline trough is exposed, and the first side face is the side face, close to a construction building, of the pipeline trough; S3, a cushion layer is mounted at the bottom ofthe position subjected to excavation for the second time; and S4, steel plate buried parts are pre-buried on the top and the first side face of the pipeline trough, concrete is poured, and an overallenclosure wall is formed. By means of the method, the pipeline trough can be protected against damage in building construction, and meanwhile stability and firmness of the pipeline trough are improved.
本发明提供了一种建筑施工中地下管线槽的保护方法,包括以下步骤:S1.在管线槽的顶部土方进行第一次开挖,以使所述管线槽顶部全部露出;S2.在所述管线槽的第一侧面处的土方进行第二次开挖,以使所述管线槽的第一侧面全部露出,所述第一侧面是指所述管线槽靠近施工建筑的侧面;S3.在所述第二次开挖处的底部安装一垫层;S4.在所述管线槽的顶部和所述第一侧面,预埋钢板埋件并浇筑混凝土,形成一个整体的围护墙。该方法可以保护管线槽在建筑施工中不被损坏,同时提高了管线槽的稳定性和牢固性。
Protection method for underground pipeline trough in building construction
一种建筑施工中地下管线槽的保护方法
YANG CHENGWEI (Autor:in) / ZHENG JUN (Autor:in) / ZHANG WEI (Autor:in)
10.04.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
F16L
PIPES
,
Rohre
/
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
Complex underground pipeline protection construction method
Europäisches Patentamt | 2023
|Underground pipeline backfill supporting protection construction method
Europäisches Patentamt | 2021
|Underground pipeline protection structure and construction method thereof
Europäisches Patentamt | 2020
|Deformation protection structure of underground pipeline and construction method
Europäisches Patentamt | 2022
|Protection device for underground original pipeline and construction method thereof
Europäisches Patentamt | 2020
|