Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Novel construction process for preventing a constructional column from overflowing slurry
The invention provides a novel construction process for preventing a constructional column from overflowing slurry. The process comprises the following specific steps that 1, the constructional columnis reserved, and arranged in a retreating-before-advancing and three-retreating three-advancing mode; 2, a formwork is manufactured according to size of the constructional column; 3, double-sided sponge glue strips are used for pasting according to the shape of a joint motor of the constructional column; 4, surface layers of the sponge glue strips on one side close to the formwork are not torn away; 5, concrete filling and pouring are carried out, and concrete is vibrated to be compact; and 6, after the constructional column concrete reaches the prescribed strength, the formwork is removed, and clearing treatment is carried out. Compared with the prior art, the novel construction process has the beneficial effects that the forming quality effect of the constructional column is greatly improved, the concrete pouring quality of the constructional column is improved, the integrity of a wall body is met, and the anti-seismic requirement is achieved.
本发明提供了一种新型构造柱防溢浆施工工艺,具体步骤为:步骤1:留置构造柱,以先退后进,三退三进设置;步骤2:构造柱按尺寸制作模板;步骤3:按构造柱马牙槎的形状,使用双面海绵胶条粘贴;步骤4:靠模板一侧的海绵胶条不撕掉面层;步骤5:填充浇筑混凝土,振捣密实;步骤6:待构造柱混凝土达到规定强度后,拆模清理。与现有技术相比,本发明的有益效果在于:大大提高了构造柱的成型质量效果,提高了构造柱的混凝土浇筑质量,满足了墙体的整体性,达到抗震要求。
Novel construction process for preventing a constructional column from overflowing slurry
The invention provides a novel construction process for preventing a constructional column from overflowing slurry. The process comprises the following specific steps that 1, the constructional columnis reserved, and arranged in a retreating-before-advancing and three-retreating three-advancing mode; 2, a formwork is manufactured according to size of the constructional column; 3, double-sided sponge glue strips are used for pasting according to the shape of a joint motor of the constructional column; 4, surface layers of the sponge glue strips on one side close to the formwork are not torn away; 5, concrete filling and pouring are carried out, and concrete is vibrated to be compact; and 6, after the constructional column concrete reaches the prescribed strength, the formwork is removed, and clearing treatment is carried out. Compared with the prior art, the novel construction process has the beneficial effects that the forming quality effect of the constructional column is greatly improved, the concrete pouring quality of the constructional column is improved, the integrity of a wall body is met, and the anti-seismic requirement is achieved.
本发明提供了一种新型构造柱防溢浆施工工艺,具体步骤为:步骤1:留置构造柱,以先退后进,三退三进设置;步骤2:构造柱按尺寸制作模板;步骤3:按构造柱马牙槎的形状,使用双面海绵胶条粘贴;步骤4:靠模板一侧的海绵胶条不撕掉面层;步骤5:填充浇筑混凝土,振捣密实;步骤6:待构造柱混凝土达到规定强度后,拆模清理。与现有技术相比,本发明的有益效果在于:大大提高了构造柱的成型质量效果,提高了构造柱的混凝土浇筑质量,满足了墙体的整体性,达到抗震要求。
Novel construction process for preventing a constructional column from overflowing slurry
一种新型构造柱防溢浆施工工艺
TANG YILONG (Autor:in) / DING HUA (Autor:in) / YU FENGFENG (Autor:in)
21.04.2020
Patent
Elektronische Ressource
Chinesisch
Prefabricated part slurry-overflowing preventing construction technology
Europäisches Patentamt | 2020
|Building hopper capable of preventing slurry material from overflowing
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2022
|Europäisches Patentamt | 2021
|Constructional column construction method and constructional column mold
Europäisches Patentamt | 2021
|