Hole plugging structure and construction method
The invention discloses a hole plugging structure. The hole plugging structure comprises base plates, top supporting rods, handing rods, bottom supporting rods and a formwork, wherein the base platesare arranged on the outer side of the top face of a hole, the top supporting rods are connected to the base plates, at least parts of the top supporting rods are located above the hole, one ends of the hanging rods are connected with the top supporting rods, the other ends of the hanging rods penetrate through the hole and protrude out of the bottom surface of the hole, the bottom supporting rodsare connected to the ends, protruding out of the bottom face of the hole, of the hanging rods, and the formwork is arranged on the bottom supporting rods to seal the bottom surface of the hole. The invention further provides a construction method for hole plugging. The hole plugging structure and the construction method have the advantages that a scaffold supporting formwork is not needed for plugging the hole, and normal operation of a subway line cannot be affected.
本申请公开了一种孔洞封堵结构,包括:垫板,设置在孔洞的顶面外侧;顶部支撑杆,连接在所述垫板上,所述顶部支撑杆的至少部分位于所述孔洞上方;吊杆,所述吊杆的一端与所述顶部支撑杆连接,所述吊杆的另一端穿过所述孔洞凸出于所述孔洞底面;底部支撑杆,连接在所述吊杆凸出于所述孔洞底面的一端;以及模板,设置在所述底部支撑杆上以封闭所述孔洞的底面。同时还提供一种孔洞封堵的施工方法。本申请的孔洞封堵结构及施工方法,具有不需要脚手架支撑模板封堵孔洞,不会影响地铁线路正常运营的优点。
Hole plugging structure and construction method
The invention discloses a hole plugging structure. The hole plugging structure comprises base plates, top supporting rods, handing rods, bottom supporting rods and a formwork, wherein the base platesare arranged on the outer side of the top face of a hole, the top supporting rods are connected to the base plates, at least parts of the top supporting rods are located above the hole, one ends of the hanging rods are connected with the top supporting rods, the other ends of the hanging rods penetrate through the hole and protrude out of the bottom surface of the hole, the bottom supporting rodsare connected to the ends, protruding out of the bottom face of the hole, of the hanging rods, and the formwork is arranged on the bottom supporting rods to seal the bottom surface of the hole. The invention further provides a construction method for hole plugging. The hole plugging structure and the construction method have the advantages that a scaffold supporting formwork is not needed for plugging the hole, and normal operation of a subway line cannot be affected.
本申请公开了一种孔洞封堵结构,包括:垫板,设置在孔洞的顶面外侧;顶部支撑杆,连接在所述垫板上,所述顶部支撑杆的至少部分位于所述孔洞上方;吊杆,所述吊杆的一端与所述顶部支撑杆连接,所述吊杆的另一端穿过所述孔洞凸出于所述孔洞底面;底部支撑杆,连接在所述吊杆凸出于所述孔洞底面的一端;以及模板,设置在所述底部支撑杆上以封闭所述孔洞的底面。同时还提供一种孔洞封堵的施工方法。本申请的孔洞封堵结构及施工方法,具有不需要脚手架支撑模板封堵孔洞,不会影响地铁线路正常运营的优点。
Hole plugging structure and construction method
一种孔洞封堵结构及施工方法
ZHOU BING (Autor:in) / LI JIANJUN (Autor:in) / JIANG YE (Autor:in) / XIE TINGTING (Autor:in) / ZHANG BO (Autor:in) / WANG LEI (Autor:in) / XIE JUN (Autor:in)
12.06.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Squeezing plugging construction method and screw hole plugging device
Europäisches Patentamt | 2022
|Building structure hole plugging device and construction method
Europäisches Patentamt | 2020
|Hole plugging device and building floor stand pipe hole plugging construction method
Europäisches Patentamt | 2021
|