Auxiliary installing and locating construction method of ash slag slab light partition wall
The invention discloses an auxiliary installing and locating construction method of an ash slag slab light partition wall and relates to the technical field of ash slag slab construction. The method comprises the steps of arranging and fixing a U-shaped locating device on a shear wall and a structural beam, plastering bonding mortar to the ash slag slab light partition wall, pushing the ash slag slab light partition wall to the installation position under auxiliary locating control of the -shaped locating device, locating the ash slag slab light partition wall through the U-shaped locating device, wedging the bottom of the ash slag slab light partition wall through wooden wedges, stuffing and tamping cement mortar or fine aggregate concrete, and finally, conducting curing on the ash slag slab light partition wall. Through the technical scheme of the construction method provided by the invention, the defects that L-shaped clamps are used for assisting in installation of the ash slag slab light partition wall can be effectively overcome. According to the construction characteristics of the ash slag slab light partition wall, the U-shaped locating device is used for assisting in installation and locating stability of the ash slag slab light partition wall during construction, the installation quality of the ash slag slab light partition wall is ensured, the convenient progress isaccelerated, and the material and labor cost can be effectively saved, and the ash slag slab light partition wall has the good practicality.
本发明公开了一种辅助安装定位灰渣板轻质隔墙的施工方法,涉及灰渣板施工技术领域;其包括在剪力墙和结构梁上布设、固定U型定位装置,对灰渣板轻质隔墙抹刮粘接砂浆,并在U型定位装置的辅助定位控制下将其推送至安装位置,利用U型定位装置将灰渣板轻质隔墙定位后,灰渣板轻质隔墙底部采用木楔楔紧,并用水泥砂浆或细石混凝土填塞、捣实;最后对灰渣板轻质隔墙进行养护;通过实施本技术方案,可有效克服利用L型卡辅助灰渣板轻质隔墙安装的缺陷,结合灰渣板轻质隔墙施工特点,应用U型定位装置在施工过程中辅助安装灰渣板轻质隔墙定位稳定,保证灰渣板轻质隔墙安装质量且加快了施工进度,并可有效节省材料及人工成本,具有很好的实用性。
Auxiliary installing and locating construction method of ash slag slab light partition wall
The invention discloses an auxiliary installing and locating construction method of an ash slag slab light partition wall and relates to the technical field of ash slag slab construction. The method comprises the steps of arranging and fixing a U-shaped locating device on a shear wall and a structural beam, plastering bonding mortar to the ash slag slab light partition wall, pushing the ash slag slab light partition wall to the installation position under auxiliary locating control of the -shaped locating device, locating the ash slag slab light partition wall through the U-shaped locating device, wedging the bottom of the ash slag slab light partition wall through wooden wedges, stuffing and tamping cement mortar or fine aggregate concrete, and finally, conducting curing on the ash slag slab light partition wall. Through the technical scheme of the construction method provided by the invention, the defects that L-shaped clamps are used for assisting in installation of the ash slag slab light partition wall can be effectively overcome. According to the construction characteristics of the ash slag slab light partition wall, the U-shaped locating device is used for assisting in installation and locating stability of the ash slag slab light partition wall during construction, the installation quality of the ash slag slab light partition wall is ensured, the convenient progress isaccelerated, and the material and labor cost can be effectively saved, and the ash slag slab light partition wall has the good practicality.
本发明公开了一种辅助安装定位灰渣板轻质隔墙的施工方法,涉及灰渣板施工技术领域;其包括在剪力墙和结构梁上布设、固定U型定位装置,对灰渣板轻质隔墙抹刮粘接砂浆,并在U型定位装置的辅助定位控制下将其推送至安装位置,利用U型定位装置将灰渣板轻质隔墙定位后,灰渣板轻质隔墙底部采用木楔楔紧,并用水泥砂浆或细石混凝土填塞、捣实;最后对灰渣板轻质隔墙进行养护;通过实施本技术方案,可有效克服利用L型卡辅助灰渣板轻质隔墙安装的缺陷,结合灰渣板轻质隔墙施工特点,应用U型定位装置在施工过程中辅助安装灰渣板轻质隔墙定位稳定,保证灰渣板轻质隔墙安装质量且加快了施工进度,并可有效节省材料及人工成本,具有很好的实用性。
Auxiliary installing and locating construction method of ash slag slab light partition wall
一种辅助安装定位灰渣板轻质隔墙的施工方法
LI BIN (Autor:in) / CHEN CHANGJUN (Autor:in) / HE YANG (Autor:in) / LIU YU (Autor:in)
15.09.2020
Patent
Elektronische Ressource
Chinesisch
PARTITION WALL STRUCTURE AND METHOD OF INSTALLING PARTITION WALL
Europäisches Patentamt | 2023
|Partition wall system, method for installing partition wall system
Europäisches Patentamt | 2022
|Building installing equipment and installing technology for light partition wall board
Europäisches Patentamt | 2020
|Method for installing and reinforcing entry door of autoclaved aerated concrete slab partition wall
Europäisches Patentamt | 2023
|