The invention relates to a boiler hoisting sling in a closed factory area and a construction method thereof. The boiler hoisting sling comprises an underframe, fixed rail beams, a movable rail beam, cathead cranes and a hoist, wherein the underframe is fixed on the ground; the plurality of fixed rail beams are arranged at the top of the underframe; the movable rail beam is suspended below the fixed rail beams through the cathead cranes; and the hoist is mounted on the movable rail beam. The construction method of the boiler hoisting sling in the closed plant area comprises the following stepsof hardening the ground foundation; leveling the ground foundation, and mounting a bottom frame on the ground foundation after the levelness reaches the requirement; mounting six stand columns on thebottom frame, and calibrating verticality; and mounting the fixed rail beams, and sequentially mounting the cathead cranes, the movable rail beam and the hoist after the fixed rail beams are mounted and qualified. In the hoisting process in a closed factory building, the hoisting process is flexible to rotate, safe and reliable, so that manpower input is effectively reduced, labor production efficiency is improved, and construction progress is accelerated.
本发明涉及封闭厂区内的锅炉吊装吊具,包括底架、固定轨道梁、移动轨道梁、猫头吊和葫芦,底架固定于地面上,底架的顶部设置有多条固定轨道梁,移动轨道梁通过猫头吊悬挂于固定轨道梁的下方,移动轨道梁上安装有葫芦。一种封闭厂区内的锅炉吊装吊具的施工方法,包括如下步骤:对地面基础进行硬化处理;对地面基础进行找平处理,并在水平度达到要求后将底层框架安装于其上;于底层框架上安装6根立柱,并校准垂直度;安装固定轨道梁,待固定轨道梁安装完成并验收合格后再依次安装、猫头吊、移动轨道梁和葫芦。在封闭厂房内吊装的过程中,吊装过程转动灵活、安全可靠,有效减少人力投入,提高劳动生产效率,加快施工进度。
The invention relates to a boiler hoisting sling in a closed factory area and a construction method thereof. The boiler hoisting sling comprises an underframe, fixed rail beams, a movable rail beam, cathead cranes and a hoist, wherein the underframe is fixed on the ground; the plurality of fixed rail beams are arranged at the top of the underframe; the movable rail beam is suspended below the fixed rail beams through the cathead cranes; and the hoist is mounted on the movable rail beam. The construction method of the boiler hoisting sling in the closed plant area comprises the following stepsof hardening the ground foundation; leveling the ground foundation, and mounting a bottom frame on the ground foundation after the levelness reaches the requirement; mounting six stand columns on thebottom frame, and calibrating verticality; and mounting the fixed rail beams, and sequentially mounting the cathead cranes, the movable rail beam and the hoist after the fixed rail beams are mounted and qualified. In the hoisting process in a closed factory building, the hoisting process is flexible to rotate, safe and reliable, so that manpower input is effectively reduced, labor production efficiency is improved, and construction progress is accelerated.
本发明涉及封闭厂区内的锅炉吊装吊具,包括底架、固定轨道梁、移动轨道梁、猫头吊和葫芦,底架固定于地面上,底架的顶部设置有多条固定轨道梁,移动轨道梁通过猫头吊悬挂于固定轨道梁的下方,移动轨道梁上安装有葫芦。一种封闭厂区内的锅炉吊装吊具的施工方法,包括如下步骤:对地面基础进行硬化处理;对地面基础进行找平处理,并在水平度达到要求后将底层框架安装于其上;于底层框架上安装6根立柱,并校准垂直度;安装固定轨道梁,待固定轨道梁安装完成并验收合格后再依次安装、猫头吊、移动轨道梁和葫芦。在封闭厂房内吊装的过程中,吊装过程转动灵活、安全可靠,有效减少人力投入,提高劳动生产效率,加快施工进度。
Boiler hoisting sling in closed factory area and construction method thereof
一种封闭厂区内的锅炉吊装吊具及施工方法
18.09.2020
Patent
Elektronische Ressource
Chinesisch
Flexible sling hoisting device and method for bridge construction
Europäisches Patentamt | 2023
|Chemical fiber sling for hoisting and preparation method thereof
Europäisches Patentamt | 2021
|Steel box girder rapid hoisting sling and using method thereof
Europäisches Patentamt | 2024
|Reinforcing mesh sling and hoisting method for reinforcing mesh
Europäisches Patentamt | 2015
|