Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Composite tunnel anchor
The invention relates to a composite tunnel anchor which comprises a first front anchor chamber, a first anchor plug body, a second front anchor chamber, a second anchor plug body and a cross beam, wherein the first front anchor chamber is arranged in a mountain body of an anchor site area; the first anchor plug body is located behind the first front anchor chamber, and the first anchor plug bodyis connected with one main cable of the suspension bridge through the first front anchor chamber; the second front anchor chamber is arranged in the mountain body of the anchor site area and is arranged in parallel with the first front anchor chamber at intervals; the second anchor plug body is located behind the second front anchor chamber, the second anchor plug body is connected with the othermain cable of the suspension bridge through the second front anchor chamber, and the second anchor plug body and the first anchor plug body are arranged in parallel at intervals; the cross beam is located between the first anchor plug body and the second anchor plug body, and the cross beam is integrally connected with the first anchor plug body and the second anchor plug body. According to the composite tunnel anchor, the scale and excavation difficulty of the tunnel anchor can be greatly reduced, and the construction period is shortened.
本发明涉及一种复合式隧道锚,其包括:第一前锚室,设于锚址区的山体内;位于所述第一前锚室后方的第一锚塞体,所述第一锚塞体通过所述第一前锚室与悬索桥其中一根主缆连接;第二前锚室,设于所述锚址区的山体内且与所述第一前锚室并列间隔设置;位于所述第二前锚室后方的第二锚塞体,所述第二锚塞体通过所述第二前锚室与所述悬索桥的另一根主缆连接,且所述第二锚塞体与所述第一锚塞体并列间隔设置;横梁,位于所述第一锚塞体与所述第二锚塞体之间,且所述横梁一体连接所述第一锚塞体与所述第二锚塞体。本发明的一种复合式隧道锚,可以使隧道锚的规模及开挖难度大大降低,加快施工周期。
Composite tunnel anchor
The invention relates to a composite tunnel anchor which comprises a first front anchor chamber, a first anchor plug body, a second front anchor chamber, a second anchor plug body and a cross beam, wherein the first front anchor chamber is arranged in a mountain body of an anchor site area; the first anchor plug body is located behind the first front anchor chamber, and the first anchor plug bodyis connected with one main cable of the suspension bridge through the first front anchor chamber; the second front anchor chamber is arranged in the mountain body of the anchor site area and is arranged in parallel with the first front anchor chamber at intervals; the second anchor plug body is located behind the second front anchor chamber, the second anchor plug body is connected with the othermain cable of the suspension bridge through the second front anchor chamber, and the second anchor plug body and the first anchor plug body are arranged in parallel at intervals; the cross beam is located between the first anchor plug body and the second anchor plug body, and the cross beam is integrally connected with the first anchor plug body and the second anchor plug body. According to the composite tunnel anchor, the scale and excavation difficulty of the tunnel anchor can be greatly reduced, and the construction period is shortened.
本发明涉及一种复合式隧道锚,其包括:第一前锚室,设于锚址区的山体内;位于所述第一前锚室后方的第一锚塞体,所述第一锚塞体通过所述第一前锚室与悬索桥其中一根主缆连接;第二前锚室,设于所述锚址区的山体内且与所述第一前锚室并列间隔设置;位于所述第二前锚室后方的第二锚塞体,所述第二锚塞体通过所述第二前锚室与所述悬索桥的另一根主缆连接,且所述第二锚塞体与所述第一锚塞体并列间隔设置;横梁,位于所述第一锚塞体与所述第二锚塞体之间,且所述横梁一体连接所述第一锚塞体与所述第二锚塞体。本发明的一种复合式隧道锚,可以使隧道锚的规模及开挖难度大大降低,加快施工周期。
Composite tunnel anchor
一种复合式隧道锚
WANG BIBO (Autor:in) / YU JIAFU (Autor:in) / WANG SHENGYI (Autor:in) / DENG GAOYANG (Autor:in) / QI SHUYAN (Autor:in) / LIU JINCHENG (Autor:in)
25.09.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Group anchor type tunnel anchor and construction method
Europäisches Patentamt | 2020
|