Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Anti-erosion riparian zone repair system and method
The invention discloses an anti-erosion riparian zone repair system and method. The repair system comprises a plurality of baffles which are arranged at intervals, wherein the baffles comprise a plurality of fixing piles; the baffles are vertical to the trend of a river; mounting frames are arranged between the baffles along the vertical direction of the river; the two ends of the mounting framesare connected with the baffles on the two sides respectively; and coverage nets are detachably hinged to the upper parts of the sides, close to the river, of the mounting frames. The repair method comprises the following steps of fixing the fixing piles into the baffles through iron wires in advance; adding fillers into planting bags in advance; binding and fixing the planting bags with fixing belts; and prefabricating separation cages and the mounting frames. The anti-erosion riparian zone repair system and method can solve the problem of poor treatment effect on river riparian zones in the prior art, is high in efficiency, low in construction amount and high in success rate, and can save the cost at the same time.
本发明公开了一种抗冲刷消落带修复系统和修复方法,修复系统包括若干间隔设置挡板,挡板包括若干固定桩,挡板与河流走向垂直,沿河流垂直方向的挡板间设置有安装架,安装架的两端分别与两侧挡板相连;安装架邻近河流一侧上部可拆卸地铰接有覆盖网。修复方法包括预先将固定桩通过铁丝固定成挡板,并在种植袋中配置预先加入填充物,通过固定带将其绑缚固定,预制分隔笼和安装架。本发明能够解决现有技术中内河消落带的治理效果不佳的问题,高效率、低施工量、高成功率,同时还能节省成本。
Anti-erosion riparian zone repair system and method
The invention discloses an anti-erosion riparian zone repair system and method. The repair system comprises a plurality of baffles which are arranged at intervals, wherein the baffles comprise a plurality of fixing piles; the baffles are vertical to the trend of a river; mounting frames are arranged between the baffles along the vertical direction of the river; the two ends of the mounting framesare connected with the baffles on the two sides respectively; and coverage nets are detachably hinged to the upper parts of the sides, close to the river, of the mounting frames. The repair method comprises the following steps of fixing the fixing piles into the baffles through iron wires in advance; adding fillers into planting bags in advance; binding and fixing the planting bags with fixing belts; and prefabricating separation cages and the mounting frames. The anti-erosion riparian zone repair system and method can solve the problem of poor treatment effect on river riparian zones in the prior art, is high in efficiency, low in construction amount and high in success rate, and can save the cost at the same time.
本发明公开了一种抗冲刷消落带修复系统和修复方法,修复系统包括若干间隔设置挡板,挡板包括若干固定桩,挡板与河流走向垂直,沿河流垂直方向的挡板间设置有安装架,安装架的两端分别与两侧挡板相连;安装架邻近河流一侧上部可拆卸地铰接有覆盖网。修复方法包括预先将固定桩通过铁丝固定成挡板,并在种植袋中配置预先加入填充物,通过固定带将其绑缚固定,预制分隔笼和安装架。本发明能够解决现有技术中内河消落带的治理效果不佳的问题,高效率、低施工量、高成功率,同时还能节省成本。
Anti-erosion riparian zone repair system and method
一种抗冲刷消落带修复系统和修复方法
LI HAIYING (Autor:in) / WANG LUHAI (Autor:in) / LU JIA (Autor:in) / LIU XIAOZHI (Autor:in) / ZHANG JUNJIE (Autor:in)
16.10.2020
Patent
Elektronische Ressource
Chinesisch
Riparian zone ecological restoration system and construction method thereof
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2021
|Riparian erosion vulnerability model based on environmental features
Online Contents | 2017
|