Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Foundation construction method of construction hoist
The invention relates to the field of building foundation construction, in particular to a foundation construction method of a construction hoist. The foundation construction method comprises the following steps that S1, a base formwork bracket is arranged on the top surface of a crown beam, and pouring is carried out to form bases; S2, a stand column formwork bracket is arranged on the top surface of the crown beam, a second reinforcing steel bar is arranged in the stand column formwork bracket, a first connecting plate is connected to the second reinforcing steel bar, and pouring is carriedout to form stand columns on the top surfaces of the bases; S3, a strengthening beam formwork bracket is arranged on the top surface of the crown beam, concrete is poured, standing maintenance is carried out, and a cross beam is formed between the two adjacent stand columns; S5, a bearing platform formwork bracket is arranged on the top surface of the crown beam, pouring is carried out, and a bearing platform is formed on the top surface of the cross beam; S6, the first connecting plate extending out of the stand columns is connected with a second connecting plate pre-embedded in a basement wall; and S7, a plurality of sixth reinforcing steel bars pre-embedded in the basement wall are inserted into the bearing platform. The foundation construction method of the construction hoist has a stable effect.
本申请涉及建筑基础施工的领域,尤其是涉及一种施工升降机基础施工方法,包括以下步骤:S1:在冠梁顶面设置底座模板支架,浇筑形成底座;S2:在冠梁顶面设置立柱模板支架,立柱模板支架内设置第二钢筋,第二钢筋上连接第一连接板,浇筑,在底座顶面形成立柱;S3:在冠梁顶面设置加固梁模板支架,混凝土浇筑,静置养护,在相邻的两条立柱之间形成加固梁;S4:在冠梁顶面设置横梁模板支架,浇筑,在相邻的两条立柱顶部形成横梁;S5:在冠梁顶面设置承台模板支架,浇筑,在横梁的顶面形成承台;S6:从立柱伸出的第一连接板与地下室墙体预埋的第二连接板连接;S7:地下室墙体预埋的若干第六钢筋插设承台。本申请具有稳定的效果。
Foundation construction method of construction hoist
The invention relates to the field of building foundation construction, in particular to a foundation construction method of a construction hoist. The foundation construction method comprises the following steps that S1, a base formwork bracket is arranged on the top surface of a crown beam, and pouring is carried out to form bases; S2, a stand column formwork bracket is arranged on the top surface of the crown beam, a second reinforcing steel bar is arranged in the stand column formwork bracket, a first connecting plate is connected to the second reinforcing steel bar, and pouring is carriedout to form stand columns on the top surfaces of the bases; S3, a strengthening beam formwork bracket is arranged on the top surface of the crown beam, concrete is poured, standing maintenance is carried out, and a cross beam is formed between the two adjacent stand columns; S5, a bearing platform formwork bracket is arranged on the top surface of the crown beam, pouring is carried out, and a bearing platform is formed on the top surface of the cross beam; S6, the first connecting plate extending out of the stand columns is connected with a second connecting plate pre-embedded in a basement wall; and S7, a plurality of sixth reinforcing steel bars pre-embedded in the basement wall are inserted into the bearing platform. The foundation construction method of the construction hoist has a stable effect.
本申请涉及建筑基础施工的领域,尤其是涉及一种施工升降机基础施工方法,包括以下步骤:S1:在冠梁顶面设置底座模板支架,浇筑形成底座;S2:在冠梁顶面设置立柱模板支架,立柱模板支架内设置第二钢筋,第二钢筋上连接第一连接板,浇筑,在底座顶面形成立柱;S3:在冠梁顶面设置加固梁模板支架,混凝土浇筑,静置养护,在相邻的两条立柱之间形成加固梁;S4:在冠梁顶面设置横梁模板支架,浇筑,在相邻的两条立柱顶部形成横梁;S5:在冠梁顶面设置承台模板支架,浇筑,在横梁的顶面形成承台;S6:从立柱伸出的第一连接板与地下室墙体预埋的第二连接板连接;S7:地下室墙体预埋的若干第六钢筋插设承台。本申请具有稳定的效果。
Foundation construction method of construction hoist
一种施工升降机基础施工方法
WEN MIANCONG (Autor:in) / ZHOU ZHIQIANG (Autor:in) / ZHANG GEWEI (Autor:in) / ZHOU XIAO (Autor:in) / CHEN TUZHEN (Autor:in)
20.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction hoist foundation and construction method of construction hoist
Europäisches Patentamt | 2021
|Basement roof construction hoist foundation construction method
Europäisches Patentamt | 2023
|Construction hoist foundation support back-jacking construction method
Europäisches Patentamt | 2024
|