Subway deep foundation pit well point dewatering system and construction method thereof
The invention relates to the field of building construction and discloses a subway deep foundation pit well point dewatering system and a construction method thereof. The subway deep foundation pit well point dewatering system comprises a well pipe, a sealing well lid, an air compressor, an air inlet pipe, a vacuum pump and a water discharging pipe. The well pipe comprises a water filtering pipe and a precipitation pipe which are arranged in a dewatering well, and the precipitation pipe is fixedly connected to the bottom of the water filtering pipe; the sealing well lid is arranged on the topof the water filtering pipe, and a first through hole and a second through hole are formed in the sealing well lid; and the air compressor and the vacuum pump are arranged outside the dewatering well,one end of the air inlet pipe is connected with the air compressor, the other end of the air inlet pipe communicates with the bottom of the well pipe through the first through hole, one end of the water discharging pipe is connected with the vacuum pump, and the other end of the water discharging pipe communicates with the bottom of the well pipe and communicates with the gas inlet pipe. By meansof the subway deep foundation pit well point dewatering system and the construction method thereof, the technical problems that an existing subway foundation pit dewatering project is high in equipment input cost, complex to install and low in dewatering efficiency are solved.
本发明涉及建筑施工领域,公开了一种地铁深基坑井点降水系统及其施工方法。该地铁深基坑井点降水系统包括井管、密封井盖、空压机、进气管、真空泵和排水管,其中:井管包括布设于降水井内的滤水管和沉淀管,沉淀管固定连接于滤水管底部;滤水管顶部设有密封井盖,密封井盖上设有第一通孔和第二通孔;空压机和真空泵布设于降水井外,进气管的一端与空压机连接,另一端经由第一通孔通至井管底部,排水管的一端与真空泵连接,另一端经由第二通孔通至所述井管底部并与进气管连通。本发明解决了现有的地铁深基坑降水工程存在的设备投入成本高、安装复杂,且降水效率低的技术问题。
Subway deep foundation pit well point dewatering system and construction method thereof
The invention relates to the field of building construction and discloses a subway deep foundation pit well point dewatering system and a construction method thereof. The subway deep foundation pit well point dewatering system comprises a well pipe, a sealing well lid, an air compressor, an air inlet pipe, a vacuum pump and a water discharging pipe. The well pipe comprises a water filtering pipe and a precipitation pipe which are arranged in a dewatering well, and the precipitation pipe is fixedly connected to the bottom of the water filtering pipe; the sealing well lid is arranged on the topof the water filtering pipe, and a first through hole and a second through hole are formed in the sealing well lid; and the air compressor and the vacuum pump are arranged outside the dewatering well,one end of the air inlet pipe is connected with the air compressor, the other end of the air inlet pipe communicates with the bottom of the well pipe through the first through hole, one end of the water discharging pipe is connected with the vacuum pump, and the other end of the water discharging pipe communicates with the bottom of the well pipe and communicates with the gas inlet pipe. By meansof the subway deep foundation pit well point dewatering system and the construction method thereof, the technical problems that an existing subway foundation pit dewatering project is high in equipment input cost, complex to install and low in dewatering efficiency are solved.
本发明涉及建筑施工领域,公开了一种地铁深基坑井点降水系统及其施工方法。该地铁深基坑井点降水系统包括井管、密封井盖、空压机、进气管、真空泵和排水管,其中:井管包括布设于降水井内的滤水管和沉淀管,沉淀管固定连接于滤水管底部;滤水管顶部设有密封井盖,密封井盖上设有第一通孔和第二通孔;空压机和真空泵布设于降水井外,进气管的一端与空压机连接,另一端经由第一通孔通至井管底部,排水管的一端与真空泵连接,另一端经由第二通孔通至所述井管底部并与进气管连通。本发明解决了现有的地铁深基坑降水工程存在的设备投入成本高、安装复杂,且降水效率低的技术问题。
Subway deep foundation pit well point dewatering system and construction method thereof
地铁深基坑井点降水系统及其施工方法
XIE AMEI (Autor:in) / KONG QI (Autor:in) / XU YAHONG (Autor:in) / LI DEZHI (Autor:in) / LUO HENGXUAN (Autor:in) / YUAN ZHIPENG (Autor:in) / YANG BO (Autor:in)
27.10.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Dewatering well construction method of subway station open-cut interval foundation pit
Europäisches Patentamt | 2021
|Dewatering well-free dewatering construction method for deep foundation pit
Europäisches Patentamt | 2022
|Deep foundation pit construction method adopting tube well and light well point dewatering
Europäisches Patentamt | 2021
|Foundation pit dewatering well and construction method thereof
Europäisches Patentamt | 2024
|Deep soft foundation pit dewatering well and construction method
Europäisches Patentamt | 2024
|