Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Prefabricated beam connecting support and connecting method
The invention discloses a prefabricated beam connecting support. The prefabricated beam connecting support comprises a main beam and a damping support device connected with the main beam. The supportis provided with horizontal outlet steel bars, and the horizontal outlet steel bars are embedded in the main beam at preset positions in advance; and the horizontal outlet steel bars and the damping support device are detachably connected. According to the prefabricated beam connecting support, as a damping device and the support are in place in advance, a brace does not need to be additionally erected when a secondary beam is installed, so that the construction process is simplified, and the construction efficiency is improved. Through cooperation use of vertical plugging ribs on the device and reserved grouting ducts in the secondary beam, the steps of joint steel bar bonding, formwork in-situ casting and the like are simplified. Meanwhile, as the grouting process is visible to the humaneyes, the connecting quality in the method is easier to control.
本发明公开了一种预制梁连接支座,包括主梁和与主梁连接的减震支座装置;所述支座设置有水平出筋钢筋,所述水平出筋钢筋按照预设位置预埋在主梁中;所述水平出筋钢筋与减震支座装置可拆卸连接。本发明由于减震装置与支座事先就位,从而使得次梁在安装时无需另外架设支撑,从而简化施工过程,提高施工效率。本发明通过装置上竖向插筋与次梁内的预留灌浆孔道的配合使用,从而简化了节点钢筋绑扎、支模现浇等步骤。同时,由于灌浆过程肉眼可见,因此本方法的连接质量更易控制。
Prefabricated beam connecting support and connecting method
The invention discloses a prefabricated beam connecting support. The prefabricated beam connecting support comprises a main beam and a damping support device connected with the main beam. The supportis provided with horizontal outlet steel bars, and the horizontal outlet steel bars are embedded in the main beam at preset positions in advance; and the horizontal outlet steel bars and the damping support device are detachably connected. According to the prefabricated beam connecting support, as a damping device and the support are in place in advance, a brace does not need to be additionally erected when a secondary beam is installed, so that the construction process is simplified, and the construction efficiency is improved. Through cooperation use of vertical plugging ribs on the device and reserved grouting ducts in the secondary beam, the steps of joint steel bar bonding, formwork in-situ casting and the like are simplified. Meanwhile, as the grouting process is visible to the humaneyes, the connecting quality in the method is easier to control.
本发明公开了一种预制梁连接支座,包括主梁和与主梁连接的减震支座装置;所述支座设置有水平出筋钢筋,所述水平出筋钢筋按照预设位置预埋在主梁中;所述水平出筋钢筋与减震支座装置可拆卸连接。本发明由于减震装置与支座事先就位,从而使得次梁在安装时无需另外架设支撑,从而简化施工过程,提高施工效率。本发明通过装置上竖向插筋与次梁内的预留灌浆孔道的配合使用,从而简化了节点钢筋绑扎、支模现浇等步骤。同时,由于灌浆过程肉眼可见,因此本方法的连接质量更易控制。
Prefabricated beam connecting support and connecting method
一种预制梁连接支座以及连接方法
BAI SHIYE (Autor:in) / LI ZHENXING (Autor:in) / KANG MENG (Autor:in) / FENG FENG (Autor:in) / XIE FUDONG (Autor:in) / ZHANG JIANLONG (Autor:in) / WANG SHUAILIANG (Autor:in)
27.10.2020
Patent
Elektronische Ressource
Chinesisch
Prefabricated connecting beam and prefabricated wall connecting end construction method
Europäisches Patentamt | 2015
|Prefabricated floor beam connecting structure and connecting method
Europäisches Patentamt | 2023
|Prefabricated concrete beam column connecting joint and connecting method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|