Assembly prefabricated wall body installation method
The invention relates to an assembly prefabricated wall body installation method. The assembly prefabricated wall body installation method comprises the following steps that (S100), a lower layer shear wall is cleaned, lines are marked in a graded mode, and all prefabricated wall bodies to be used are transported to a construction field for standby use; (S200), super cement admixtures used for thesame day are prepared; (S300), the prefabricated wall bodies are installed, and seams between the adjacent prefabricated wall bodies and between the prefabricated wall bodies and the lower layer shear wall are covered and plastered with the super cement admixtures, and the prefabricated wall bodies positioned initially are supported with a side support; (S400), seam filling and slurry scraping are carried out to improve the connecting compactness and stability of the adjacent prefabricated wall bodies; and (S500), quality testing and acceptance check are carried out. The assembly fabricated wall body installation method has the advantages that the construction period of the prefabricated wall bodies is short, and the construction quality can be effectively ensured.
本发明涉及一种装配式预制墙体安装方法,其包括如下步骤:S100、清理下层剪力墙,分档弹线,将所有待用的预制墙体运输至施工现场以备用;S200、制备当天所用的超级水泥混合料;S300、安装预制墙体,在相邻的预制墙体及预制墙体与下层剪力墙的缝隙之间覆抹超级水泥混合料,以侧撑架支撑初步定位后的预制墙体;S400、补缝刮浆,提高相邻预制墙体的连接紧密度及稳定性;S500、质量测试及验收。本发明具有预制墙体施工周期短,且可有效保障施工质量的效果。
Assembly prefabricated wall body installation method
The invention relates to an assembly prefabricated wall body installation method. The assembly prefabricated wall body installation method comprises the following steps that (S100), a lower layer shear wall is cleaned, lines are marked in a graded mode, and all prefabricated wall bodies to be used are transported to a construction field for standby use; (S200), super cement admixtures used for thesame day are prepared; (S300), the prefabricated wall bodies are installed, and seams between the adjacent prefabricated wall bodies and between the prefabricated wall bodies and the lower layer shear wall are covered and plastered with the super cement admixtures, and the prefabricated wall bodies positioned initially are supported with a side support; (S400), seam filling and slurry scraping are carried out to improve the connecting compactness and stability of the adjacent prefabricated wall bodies; and (S500), quality testing and acceptance check are carried out. The assembly fabricated wall body installation method has the advantages that the construction period of the prefabricated wall bodies is short, and the construction quality can be effectively ensured.
本发明涉及一种装配式预制墙体安装方法,其包括如下步骤:S100、清理下层剪力墙,分档弹线,将所有待用的预制墙体运输至施工现场以备用;S200、制备当天所用的超级水泥混合料;S300、安装预制墙体,在相邻的预制墙体及预制墙体与下层剪力墙的缝隙之间覆抹超级水泥混合料,以侧撑架支撑初步定位后的预制墙体;S400、补缝刮浆,提高相邻预制墙体的连接紧密度及稳定性;S500、质量测试及验收。本发明具有预制墙体施工周期短,且可有效保障施工质量的效果。
Assembly prefabricated wall body installation method
一种装配式预制墙体安装方法
LIU ZHIJIAN (Autor:in) / LIU LINGLING (Autor:in) / ZHONG JINGXU (Autor:in) / ZENG DEYUN (Autor:in)
27.10.2020
Patent
Elektronische Ressource
Chinesisch
Installation and construction method for prefabricated concrete assembly type wall
Europäisches Patentamt | 2020
|Prefabricated wall installation elevation control method
Europäisches Patentamt | 2022
|Photovoltaic integrated prefabricated outer wall assembly type installation structure and method
Europäisches Patentamt | 2024
|Installation method of prefabricated non-bearing wall
Europäisches Patentamt | 2020
|