Assembled laminated slab standardized pipeline pre-buried wiring method
The invention discloses an assembled laminated slab standardized pipeline pre-buried wiring method, and relates to the technical field of assembled constructional engineering in the production and installation process. According to the assembled laminated slab standardized pipeline pre-buried wiring method, it is avoided that when chiseling and cutting are conducted on a construction site, prefabricated parts are damaged; a pre-buried point position comprehensive graph is reserved, so that leakage checking and vacancy filling are facilitated, meanwhile, the equipment point position conflict situation between all systems can be conveniently checked, and problems are found and solved in time. after a pipeline optimal arrangement diagram is provided, the pipeline laying modes of the same house type on the construction site are the same, and later pipeline repair is facilitated; the overlapped and crossed areas are independently designed, the thickness of a structural layer is reduced, later cracking of the laminated slab due to excessive concentration of pipelines is avoided, and meanwhile, the construction cost is reduced; after concrete pouring is completed, marks are made in the wiring area, and pipelines are prevented from being damaged in the later construction process.
本发明公开了一种装配式叠合板标准化管线预埋布线方法,涉及装配式建筑工程在生产及安装过程中的技术领域。本发明提供的装配式叠合板标准化管线预埋布线方法,避免在施工现场进行剔凿、切割时破坏预制构件,预留预埋点位综合图方便查漏补缺的同时也便于检查各个系统间的设备点位冲突情况,及时发现问题并解决问题;出具管线优化布置图后,施工现场相同户型的管线敷设方式相同,便于后期管线修复;对于重叠交叉区域进行单独设计,减小结构层厚度,不会由于管线过于集中而造成叠合板后期开裂,同时降低工程造价;混凝土浇筑完成后在布线区内做好标识,防止后期由于施工过程破坏管线。
Assembled laminated slab standardized pipeline pre-buried wiring method
The invention discloses an assembled laminated slab standardized pipeline pre-buried wiring method, and relates to the technical field of assembled constructional engineering in the production and installation process. According to the assembled laminated slab standardized pipeline pre-buried wiring method, it is avoided that when chiseling and cutting are conducted on a construction site, prefabricated parts are damaged; a pre-buried point position comprehensive graph is reserved, so that leakage checking and vacancy filling are facilitated, meanwhile, the equipment point position conflict situation between all systems can be conveniently checked, and problems are found and solved in time. after a pipeline optimal arrangement diagram is provided, the pipeline laying modes of the same house type on the construction site are the same, and later pipeline repair is facilitated; the overlapped and crossed areas are independently designed, the thickness of a structural layer is reduced, later cracking of the laminated slab due to excessive concentration of pipelines is avoided, and meanwhile, the construction cost is reduced; after concrete pouring is completed, marks are made in the wiring area, and pipelines are prevented from being damaged in the later construction process.
本发明公开了一种装配式叠合板标准化管线预埋布线方法,涉及装配式建筑工程在生产及安装过程中的技术领域。本发明提供的装配式叠合板标准化管线预埋布线方法,避免在施工现场进行剔凿、切割时破坏预制构件,预留预埋点位综合图方便查漏补缺的同时也便于检查各个系统间的设备点位冲突情况,及时发现问题并解决问题;出具管线优化布置图后,施工现场相同户型的管线敷设方式相同,便于后期管线修复;对于重叠交叉区域进行单独设计,减小结构层厚度,不会由于管线过于集中而造成叠合板后期开裂,同时降低工程造价;混凝土浇筑完成后在布线区内做好标识,防止后期由于施工过程破坏管线。
Assembled laminated slab standardized pipeline pre-buried wiring method
装配式叠合板标准化管线预埋布线方法
LU CHUAN (Autor:in) / ZHANG XIAOFENG (Autor:in) / LIU CHUNRONG (Autor:in)
03.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
H02G
INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
,
Verlegen oder Installieren elektrischer Kabel oder Leitungen, Verlegen oder Installieren kombinierter optischer und elektrischer Kabel oder Leitungen
/
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Europäisches Patentamt | 2020
|