Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method and system for repairing defective cast-in-place pile
The invention discloses a method and system for repairing a defective cast-in-place pile. The method comprises the steps of carrying out the construction preparation before repairing after the defectposition and elevation of a to-be-treated cast-in-place pile are determined, cleaning the defect position of the to-be-treated cast-in-place pile, carrying out the defect repairing, finally carrying out the acceptance check of the repairing, and sending a generated acceptance report to an upper computer for storing and displaying. According to the method, the method for repairing the defective cast-in-place pile is standardized, so that a unified standard is formed, effective connection between the cast-in-place pile to be treated and a bearing platform can be effectively achieved, meanwhile,construction is easy and convenient, the construction cost is low, the defective cast-in-place pile can be reused, resource waste and construction cost are reduced, construction efficiency is improved, and meanwhile, the acceptance report is uploaded, so that subsequent data analysis and processing are facilitated.
本发明公开了一种缺陷灌注桩的修复方法及系统,确定待处理灌注桩的缺陷位置及标高后,进行修复前的施工准备工作,清洗待处理灌注桩的缺陷位置并进行缺陷修复,最后对修复工作进行验收,生成的验收报告发送至上位机进行存储及显示,上述方法规范缺陷灌注桩的修复方法,使其形成统一标准,能够有效实现待处理灌注桩和承台的有效连接,同时施工简便且工程造价低,使得存在缺陷的灌注桩能够重新得到利用,降低资源浪费和施工成本,提高施工效率。同时上传验收报告以便于后续对数据进行分析处理。
Method and system for repairing defective cast-in-place pile
The invention discloses a method and system for repairing a defective cast-in-place pile. The method comprises the steps of carrying out the construction preparation before repairing after the defectposition and elevation of a to-be-treated cast-in-place pile are determined, cleaning the defect position of the to-be-treated cast-in-place pile, carrying out the defect repairing, finally carrying out the acceptance check of the repairing, and sending a generated acceptance report to an upper computer for storing and displaying. According to the method, the method for repairing the defective cast-in-place pile is standardized, so that a unified standard is formed, effective connection between the cast-in-place pile to be treated and a bearing platform can be effectively achieved, meanwhile,construction is easy and convenient, the construction cost is low, the defective cast-in-place pile can be reused, resource waste and construction cost are reduced, construction efficiency is improved, and meanwhile, the acceptance report is uploaded, so that subsequent data analysis and processing are facilitated.
本发明公开了一种缺陷灌注桩的修复方法及系统,确定待处理灌注桩的缺陷位置及标高后,进行修复前的施工准备工作,清洗待处理灌注桩的缺陷位置并进行缺陷修复,最后对修复工作进行验收,生成的验收报告发送至上位机进行存储及显示,上述方法规范缺陷灌注桩的修复方法,使其形成统一标准,能够有效实现待处理灌注桩和承台的有效连接,同时施工简便且工程造价低,使得存在缺陷的灌注桩能够重新得到利用,降低资源浪费和施工成本,提高施工效率。同时上传验收报告以便于后续对数据进行分析处理。
Method and system for repairing defective cast-in-place pile
一种缺陷灌注桩的修复方法及系统
XU HONGRI (Autor:in) / LUO MINGLIANG (Autor:in) / WU ZHENGGUANG (Autor:in) / YANG SONGBO (Autor:in) / REN JIABANG (Autor:in) / SUN XIAOLONG (Autor:in) / ZHAI CUIWEN (Autor:in) / MAI LIWEN (Autor:in) / HE JUNLIANG (Autor:in) / CHEN JUNSHENG (Autor:in)
13.11.2020
Patent
Elektronische Ressource
Chinesisch
Pile-in-pile structure formed based on defective cast-in-place pile construction
Europäisches Patentamt | 2022
|Method for maintaining and treating defective cast-in-place pile
Europäisches Patentamt | 2022
|Cast-in-place pile defect detecting and repairing method for construction engineering
Europäisches Patentamt | 2020
|