Static cutting method of pre-buried pipe penetrating type concrete structure
The invention provides a static cutting method of a pre-buried pipe penetrating type concrete structure. The static cutting method is used for cutting the concrete structure and comprises the following steps that when the concrete structure is built, a cutting pipeline and a hoisting pipeline are pre-buried in the concrete structure, wherein the cutting pipeline is used for a diamond rope to penetrate through and can cut the concrete structure, and the hoisting pipeline is used for hoisting the cut concrete structure; when the concrete structure is dismantled, the diamond rope penetrates through the cutting pipeline; the concrete structure is cut by the diamond rope; and the steel wire rope penetrates through the hoisting pipeline to hoist the cut concrete structure. According to the static cutting method for the pre-buried pipe penetrating type concrete structure, the cutting pipeline used for cutting the concrete structure and the hoisting pipeline used for hoisting the cut concreteblock are pre-buried in the concrete structure, the cutting pipeline can be arranged in place, complete cutting of the to-be-cut concrete structure is achieved, manual chiseling is not needed, the efficiency is improved, the cutting pipeline can be flexibly arranged, and the cost is saved.
本发明提供了一种预埋穿管式混凝土结构的静力切割方法,用于切割混凝土结构,包括:修建混凝土结构时,在混凝土结构内预埋用于金刚石绳穿过并能切割混凝土结构的切割管道和用于吊运切割后的混凝土结构的吊运管道;拆除混凝土结构时将金刚石绳穿过所述切割管道;金刚石绳切割混凝土结构;将钢丝绳穿过所述吊运管道吊运切割后的混凝土结构。在本发明提供的一种预埋穿管式混凝土结构的静力切割方法,在混凝土结构内预埋用于切割混凝土结构的切割管道以及用于吊运切割后的混凝土块的吊运管道,可以将切割管道设置到位,实现待切割混凝土结构的完全切割,不用再增加人工凿除,提高了效率,并且能灵活设置切割管道,节约了成本。
Static cutting method of pre-buried pipe penetrating type concrete structure
The invention provides a static cutting method of a pre-buried pipe penetrating type concrete structure. The static cutting method is used for cutting the concrete structure and comprises the following steps that when the concrete structure is built, a cutting pipeline and a hoisting pipeline are pre-buried in the concrete structure, wherein the cutting pipeline is used for a diamond rope to penetrate through and can cut the concrete structure, and the hoisting pipeline is used for hoisting the cut concrete structure; when the concrete structure is dismantled, the diamond rope penetrates through the cutting pipeline; the concrete structure is cut by the diamond rope; and the steel wire rope penetrates through the hoisting pipeline to hoist the cut concrete structure. According to the static cutting method for the pre-buried pipe penetrating type concrete structure, the cutting pipeline used for cutting the concrete structure and the hoisting pipeline used for hoisting the cut concreteblock are pre-buried in the concrete structure, the cutting pipeline can be arranged in place, complete cutting of the to-be-cut concrete structure is achieved, manual chiseling is not needed, the efficiency is improved, the cutting pipeline can be flexibly arranged, and the cost is saved.
本发明提供了一种预埋穿管式混凝土结构的静力切割方法,用于切割混凝土结构,包括:修建混凝土结构时,在混凝土结构内预埋用于金刚石绳穿过并能切割混凝土结构的切割管道和用于吊运切割后的混凝土结构的吊运管道;拆除混凝土结构时将金刚石绳穿过所述切割管道;金刚石绳切割混凝土结构;将钢丝绳穿过所述吊运管道吊运切割后的混凝土结构。在本发明提供的一种预埋穿管式混凝土结构的静力切割方法,在混凝土结构内预埋用于切割混凝土结构的切割管道以及用于吊运切割后的混凝土块的吊运管道,可以将切割管道设置到位,实现待切割混凝土结构的完全切割,不用再增加人工凿除,提高了效率,并且能灵活设置切割管道,节约了成本。
Static cutting method of pre-buried pipe penetrating type concrete structure
预埋穿管式混凝土结构的静力切割方法
WANG BIN (Autor:in) / GU LONGQIANG (Autor:in) / GU JIE (Autor:in) / WANG JINGBO (Autor:in) / XU XIAOFENG (Autor:in) / WU WEIHUA (Autor:in) / TIAN WEIWEI (Autor:in) / LIU ZHIRUI (Autor:in) / PAN XIUZHE (Autor:in)
27.11.2020
Patent
Elektronische Ressource
Chinesisch
BURIED STRUCTURE OF BURIED PIPE AND METHOD FOR BURYING BURIED PIPE
Europäisches Patentamt | 2023
|INSTALLATION METHOD OF BURIED PIPE AND BURIED PIPE CUTTING AND INSTALLATION DEVICE USED THEREFOR
Europäisches Patentamt | 2017
|A design method for buried concrete pipe
TIBKAT | 1979
|Segmentation of buried concrete pipe images
Elsevier | 2005
|