High tower used for line crossing in ultra-high-voltage transmission line construction and assembling method of high tower
The invention relates to the technical field of electric equipment, in particular to a high tower used for line crossing in ultra-high-voltage transmission line construction and an assembling method of the high tower. The high tower comprises an electric tower body. The electric tower body comprises a base, a tower body and a tower head which are sequentially arranged from bottom to top. Each of the base, the tower body and the tower head comprises four supporting feet which are evenly distributed in the circumferential direction, angle steel in bolt connection with every two adjacent supporting feet is arranged at the position, between the corresponding two adjacent supporting feet in the vertical direction, of the tower body, and connecting steel bars used for being connected with everytwo adjacent supporting feet are arranged at the positions, at the upper ends and the lower ends of the corresponding two adjacent supporting feet located at the same horizontal height, of the tower body. When the high tower used for line crossing in ultra-high-voltage transmission line construction is assembled, the labor intensity of electric constructors is well lowered, and in addition, the construction labor hours of the high tower used for line crossing in ultra-high-voltage transmission line construction can also be well reduced.
本发明涉及电力设备技术领域,具体地说,涉及一种用于特高压输电线路施工中线路跨越用高塔及其组立方法,其包括电塔本体,电塔本体包括从下至上依次设置的基座、塔身以及塔头,基座、塔身以及塔头均包括4根沿周向均匀分布的支脚,塔身本体上沿竖直方向上的两相邻支脚之间设有与两相邻支脚螺栓连接的角钢,塔身本体上位于同一水平高度的两相邻支脚的上下端均设有用于连接两相邻支脚的连接钢条。本发明中的用于特高压输电线路施工中线路跨越用高塔在组立时,既较佳的降低了电力施工人员的劳动强度,又可以较佳的减小该用于特高压输电线路施工中线路跨越用高塔施工工时。
High tower used for line crossing in ultra-high-voltage transmission line construction and assembling method of high tower
The invention relates to the technical field of electric equipment, in particular to a high tower used for line crossing in ultra-high-voltage transmission line construction and an assembling method of the high tower. The high tower comprises an electric tower body. The electric tower body comprises a base, a tower body and a tower head which are sequentially arranged from bottom to top. Each of the base, the tower body and the tower head comprises four supporting feet which are evenly distributed in the circumferential direction, angle steel in bolt connection with every two adjacent supporting feet is arranged at the position, between the corresponding two adjacent supporting feet in the vertical direction, of the tower body, and connecting steel bars used for being connected with everytwo adjacent supporting feet are arranged at the positions, at the upper ends and the lower ends of the corresponding two adjacent supporting feet located at the same horizontal height, of the tower body. When the high tower used for line crossing in ultra-high-voltage transmission line construction is assembled, the labor intensity of electric constructors is well lowered, and in addition, the construction labor hours of the high tower used for line crossing in ultra-high-voltage transmission line construction can also be well reduced.
本发明涉及电力设备技术领域,具体地说,涉及一种用于特高压输电线路施工中线路跨越用高塔及其组立方法,其包括电塔本体,电塔本体包括从下至上依次设置的基座、塔身以及塔头,基座、塔身以及塔头均包括4根沿周向均匀分布的支脚,塔身本体上沿竖直方向上的两相邻支脚之间设有与两相邻支脚螺栓连接的角钢,塔身本体上位于同一水平高度的两相邻支脚的上下端均设有用于连接两相邻支脚的连接钢条。本发明中的用于特高压输电线路施工中线路跨越用高塔在组立时,既较佳的降低了电力施工人员的劳动强度,又可以较佳的减小该用于特高压输电线路施工中线路跨越用高塔施工工时。
High tower used for line crossing in ultra-high-voltage transmission line construction and assembling method of high tower
用于特高压输电线路施工中线路跨越用高塔及其组立方法
HAN QIYUN (Autor:in) / ZHANG PENGCHENG (Autor:in) / LIU YUNFEI (Autor:in) / GUI HEHUAI (Autor:in) / LYU MENG (Autor:in) / FAN CHENGXIANG (Autor:in) / SUN HANFEI (Autor:in) / WANG CHAO (Autor:in) / GUAN SHAOFENG (Autor:in) / WANG JIE (Autor:in)
27.11.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2023
|Europäisches Patentamt | 2020
|Guyed tower structure of high-voltage transmission line
Europäisches Patentamt | 2022
|