High tower for line crossing in high-voltage transmission line construction and assembling method thereof
The invention discloses a high tower for line crossing in high-voltage transmission line construction and an assembling method thereof, and belongs to the technical field of high-voltage transmission line construction.The high tower comprises a tower body, the tower body comprises a lower base and an upper top base, and the lower base and the upper top base are connected through four supporting columns; the lower bases and the upper top bases of every two adjacent tower bodies are connected through bolts, the lower bases and the upper top bases are both in a square frame shape, auxiliary assemblies are arranged in the middles of the lower bases, positioning assemblies are arranged in the middles of the upper top bases, and four clamping assemblies are symmetrically arranged in the middles of the upper ends of the upper top bases. Through mutual cooperation of the auxiliary assembly and the positioning assembly, threaded holes of the lower base and the upper top base are rapidly and conveniently aligned, the situation that the threaded holes are difficult to align during hoisting for installation is avoided, and the problem that threaded installation is troublesome due to the fact that the threaded holes are difficult to align is solved.
本发明公开了一种用于高压输电线路施工中线路跨越用高塔及其组立方法,属于高压输电线路施工技术领域,包括塔身本体,所述塔身本体包括下底座和上顶座,所述下底座和上顶座之间通过四个支撑柱连接,相邻两个所述塔身本体的下底座与上顶座通过螺栓连接,所述下底座和上顶座均为正方框形设置,所述下底座中部设有辅助组件,所述上顶座中部设有定位组件,所述上顶座上端中部对称设有四个卡合组件,通过辅助组件与定位组件的相互配合,使得下底座与上顶座的螺纹孔快速方便的进行对齐,避免吊起进行安装时螺纹孔难以对齐,解决了螺纹孔难以对齐导致螺纹安装较为麻烦的问题。
High tower for line crossing in high-voltage transmission line construction and assembling method thereof
The invention discloses a high tower for line crossing in high-voltage transmission line construction and an assembling method thereof, and belongs to the technical field of high-voltage transmission line construction.The high tower comprises a tower body, the tower body comprises a lower base and an upper top base, and the lower base and the upper top base are connected through four supporting columns; the lower bases and the upper top bases of every two adjacent tower bodies are connected through bolts, the lower bases and the upper top bases are both in a square frame shape, auxiliary assemblies are arranged in the middles of the lower bases, positioning assemblies are arranged in the middles of the upper top bases, and four clamping assemblies are symmetrically arranged in the middles of the upper ends of the upper top bases. Through mutual cooperation of the auxiliary assembly and the positioning assembly, threaded holes of the lower base and the upper top base are rapidly and conveniently aligned, the situation that the threaded holes are difficult to align during hoisting for installation is avoided, and the problem that threaded installation is troublesome due to the fact that the threaded holes are difficult to align is solved.
本发明公开了一种用于高压输电线路施工中线路跨越用高塔及其组立方法,属于高压输电线路施工技术领域,包括塔身本体,所述塔身本体包括下底座和上顶座,所述下底座和上顶座之间通过四个支撑柱连接,相邻两个所述塔身本体的下底座与上顶座通过螺栓连接,所述下底座和上顶座均为正方框形设置,所述下底座中部设有辅助组件,所述上顶座中部设有定位组件,所述上顶座上端中部对称设有四个卡合组件,通过辅助组件与定位组件的相互配合,使得下底座与上顶座的螺纹孔快速方便的进行对齐,避免吊起进行安装时螺纹孔难以对齐,解决了螺纹孔难以对齐导致螺纹安装较为麻烦的问题。
High tower for line crossing in high-voltage transmission line construction and assembling method thereof
一种用于高压输电线路施工中线路跨越用高塔及其组立方法
ZENG DEZUAN (Autor:in) / LYU HONGYUAN (Autor:in) / BAI LI (Autor:in)
28.06.2022
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|Construction method of high-low voltage power transmission line metal tower
Europäisches Patentamt | 2020
|Guyed tower structure of high-voltage transmission line
Europäisches Patentamt | 2022
|