Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Pile driver for construction site
The invention discloses a pile driver for a construction site. The pile driver comprises a bottom plate, a support and a pile driving mechanism, wherein the pile driving mechanism comprises a pile driving barrel, a driving mechanism and a clamping mechanism; the driving mechanism comprises a first gear, a second gear, a guide rod and a sliding box; and a lubricating mechanism is arranged in the sliding box. By arranging the driving mechanism, compared with a traditional pile driver which pulls a pile hammer through a steel wire rope for striking, the pile driver can drive the pile hammer to repeatedly and rapidly hammer timber piles through a motor, and the pile driving efficiency is greatly improved; and by arranging the lubricating mechanism, the lubricating mechanism is driven to discharge oil while the driving mechanism operates, thus, the driving mechanism operates more smoothly, and equipment is prevented from being disassembled and lubricated.
本发明公开了一种建筑工地用打桩机,包括底板、支架和打桩机构,所述打桩机构包括打桩筒、驱动机构和夹持机构,所述驱动机构包括第一齿轮、第二齿轮、导杆和滑盒,所述滑盒内设有润滑机构,通过设置驱动机构,相比传统打桩机利用钢丝绳牵引打桩锤进行打击,本发明可通过电机带动打桩锤反复快速锤击木桩,大大提高了打桩效率;通过设置润滑机构,在去驱动机构运作的同时,带动润滑机构出油,从而使驱动机构运行时更加顺畅,避免了对设备进行拆卸润滑。
Pile driver for construction site
The invention discloses a pile driver for a construction site. The pile driver comprises a bottom plate, a support and a pile driving mechanism, wherein the pile driving mechanism comprises a pile driving barrel, a driving mechanism and a clamping mechanism; the driving mechanism comprises a first gear, a second gear, a guide rod and a sliding box; and a lubricating mechanism is arranged in the sliding box. By arranging the driving mechanism, compared with a traditional pile driver which pulls a pile hammer through a steel wire rope for striking, the pile driver can drive the pile hammer to repeatedly and rapidly hammer timber piles through a motor, and the pile driving efficiency is greatly improved; and by arranging the lubricating mechanism, the lubricating mechanism is driven to discharge oil while the driving mechanism operates, thus, the driving mechanism operates more smoothly, and equipment is prevented from being disassembled and lubricated.
本发明公开了一种建筑工地用打桩机,包括底板、支架和打桩机构,所述打桩机构包括打桩筒、驱动机构和夹持机构,所述驱动机构包括第一齿轮、第二齿轮、导杆和滑盒,所述滑盒内设有润滑机构,通过设置驱动机构,相比传统打桩机利用钢丝绳牵引打桩锤进行打击,本发明可通过电机带动打桩锤反复快速锤击木桩,大大提高了打桩效率;通过设置润滑机构,在去驱动机构运作的同时,带动润滑机构出油,从而使驱动机构运行时更加顺畅,避免了对设备进行拆卸润滑。
Pile driver for construction site
一种建筑工地用打桩机
LI KUI (Autor:in) / WU JIKUN (Autor:in) / CHEN SINING (Autor:in) / ZHU JIE (Autor:in) / CHEN YULIANG (Autor:in) / CHU ZHIFENG (Autor:in) / GU HAO (Autor:in) / JI JIA (Autor:in) / DAI PING (Autor:in) / WANG LILI (Autor:in)
11.12.2020
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen