Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Automatic pile driver for construction site
The invention discloses an a automatic pile driver for a construction site. The automatic pile driver for the construction site comprises a pile driving vehicle; a connecting frame is installed on the outer wall of the top of the pile driving vehicle; an adjusting assembly and a pile driving frame are arranged on the side wall of the connecting frame; a first electric telescopic rod is fixedly installed on the outer wall at the bottom of the pile driving frame, and the output end of the first electric telescopic rod is connected to a pile driving block; through the arrangement of the first electric telescopic rod, a pile hammer and a distance sensor, the first electric telescopic rod drives the pile hammer to impact downwards through the pile driving block and a connecting block to pile the ground; and after the pile hammer performs pile driving for multiple times, the distance sensor detects the distance of pile driving, and when the distance of pile driving reaches a proper height, the distance sensor transmits detected information into a second controller, and the second controller controls the first electric telescopic rod to stop the pile hammer, so that the movement of the pile hammer can be controlled. Therefore, the quality of a pile driving ground of the pile hammer is improved, the distance of pile driving of the pile hammer is prevented from being too large, to guarantee the quality of a building construction foundation.
本发明为一种建筑工地用自动化打桩机,包括打桩车,打桩车的顶部外壁上安装有连接架,连接架的侧壁上设置有调节组件与打桩架,打桩架的底部外壁上固定安装有第一电动伸缩杆,第一电动伸缩杆的输出端连接有打桩块,通过设置的第一电动伸缩杆、打桩锤和距离传感器,第一电动伸缩杆通过打桩块和连接块带动打桩锤向下冲击,对地面进行打桩,打桩锤在多次的进行打桩后,距离传感器对打桩的距离进行检测,当打桩的距离在到达合适的高度后,距离传感器将检测的信息传输到第二控制器内,第二控制器在控制第一电动伸缩杆将打桩锤停止运行,这样便可控制打桩锤的运动,从而提高打桩锤打桩地面的质量,避免打桩锤打桩的距离过大,以保证建筑施工地基质量。
Automatic pile driver for construction site
The invention discloses an a automatic pile driver for a construction site. The automatic pile driver for the construction site comprises a pile driving vehicle; a connecting frame is installed on the outer wall of the top of the pile driving vehicle; an adjusting assembly and a pile driving frame are arranged on the side wall of the connecting frame; a first electric telescopic rod is fixedly installed on the outer wall at the bottom of the pile driving frame, and the output end of the first electric telescopic rod is connected to a pile driving block; through the arrangement of the first electric telescopic rod, a pile hammer and a distance sensor, the first electric telescopic rod drives the pile hammer to impact downwards through the pile driving block and a connecting block to pile the ground; and after the pile hammer performs pile driving for multiple times, the distance sensor detects the distance of pile driving, and when the distance of pile driving reaches a proper height, the distance sensor transmits detected information into a second controller, and the second controller controls the first electric telescopic rod to stop the pile hammer, so that the movement of the pile hammer can be controlled. Therefore, the quality of a pile driving ground of the pile hammer is improved, the distance of pile driving of the pile hammer is prevented from being too large, to guarantee the quality of a building construction foundation.
本发明为一种建筑工地用自动化打桩机,包括打桩车,打桩车的顶部外壁上安装有连接架,连接架的侧壁上设置有调节组件与打桩架,打桩架的底部外壁上固定安装有第一电动伸缩杆,第一电动伸缩杆的输出端连接有打桩块,通过设置的第一电动伸缩杆、打桩锤和距离传感器,第一电动伸缩杆通过打桩块和连接块带动打桩锤向下冲击,对地面进行打桩,打桩锤在多次的进行打桩后,距离传感器对打桩的距离进行检测,当打桩的距离在到达合适的高度后,距离传感器将检测的信息传输到第二控制器内,第二控制器在控制第一电动伸缩杆将打桩锤停止运行,这样便可控制打桩锤的运动,从而提高打桩锤打桩地面的质量,避免打桩锤打桩的距离过大,以保证建筑施工地基质量。
Automatic pile driver for construction site
一种建筑工地用自动化打桩机
SHI CHENGYUAN (Autor:in) / FAN JINHUI (Autor:in) / ZHOU LIN (Autor:in) / CHEN ZHENYI (Autor:in) / XIE QIJI (Autor:in) / WANG YAJUN (Autor:in)
09.11.2021
Patent
Elektronische Ressource
Chinesisch
Full-automatic intelligent pile driver and construction method
Europäisches Patentamt | 2024
|