Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Concrete spray pipe for building construction
The invention discloses a concrete spray pipe for building construction. The concrete spray pipe comprises a hose and a heat preservation pipe, wherein a conveying pump is mounted in the heat preservation pipe; the upper end of the conveying pump and the upper end of the hose are sleeved with pump pipe connectors A correspondingly; a pump pipe connector B is arranged at the lower end of the conveying pump; a sealing ring is arranged at the lower end of the pump pipe connector B; the sealing ring, the pump pipe connectors A and the pump pipe connector B are fixedly connected through a pump pipeclamp; the lower end of the hose is sleeved with a telescopic device; and the telescopic device comprises a fixing sleeve, an L-shaped support, an inner sleeve rod and a sleeve rod handle. Through the telescopic device, a building worker does not need to stand beside the hose to pour the building ground, the telescopic device can be pushed to drive the hose to work, the situation that the building worker is deeply sunken into concrete when the concrete falls into the building ground is avoided, the building worker can walk in a place without the concrete, and thus the problem that concrete pouring is slow is avoided.
本发明公开一种建筑施工用混凝土喷管,包括软管和保温管,所述保温管的内部安装有输送泵,所述输送泵和软管的上端均套接有泵管接头A,所述输送泵的下端设置有泵管接头B,所述泵管接头B的下端设置有密封圈,所述密封圈、泵管接头A和泵管接头B通过泵管管卡固定连接,所述软管的下端外部套接有伸缩装置,所述伸缩装置包括固定套、L型支架、内套杆和套杆把手,伸缩装置有利于建筑工人不必站在软管旁边浇筑建筑地面,可以通过推动伸缩装置来带动软管进行作业,避免了混凝土在落入建筑地面是导致建筑工人深陷混凝土当中,建筑工人可以在无混凝土的地方进行行走,从而避免了浇筑混凝土缓慢的问题。
Concrete spray pipe for building construction
The invention discloses a concrete spray pipe for building construction. The concrete spray pipe comprises a hose and a heat preservation pipe, wherein a conveying pump is mounted in the heat preservation pipe; the upper end of the conveying pump and the upper end of the hose are sleeved with pump pipe connectors A correspondingly; a pump pipe connector B is arranged at the lower end of the conveying pump; a sealing ring is arranged at the lower end of the pump pipe connector B; the sealing ring, the pump pipe connectors A and the pump pipe connector B are fixedly connected through a pump pipeclamp; the lower end of the hose is sleeved with a telescopic device; and the telescopic device comprises a fixing sleeve, an L-shaped support, an inner sleeve rod and a sleeve rod handle. Through the telescopic device, a building worker does not need to stand beside the hose to pour the building ground, the telescopic device can be pushed to drive the hose to work, the situation that the building worker is deeply sunken into concrete when the concrete falls into the building ground is avoided, the building worker can walk in a place without the concrete, and thus the problem that concrete pouring is slow is avoided.
本发明公开一种建筑施工用混凝土喷管,包括软管和保温管,所述保温管的内部安装有输送泵,所述输送泵和软管的上端均套接有泵管接头A,所述输送泵的下端设置有泵管接头B,所述泵管接头B的下端设置有密封圈,所述密封圈、泵管接头A和泵管接头B通过泵管管卡固定连接,所述软管的下端外部套接有伸缩装置,所述伸缩装置包括固定套、L型支架、内套杆和套杆把手,伸缩装置有利于建筑工人不必站在软管旁边浇筑建筑地面,可以通过推动伸缩装置来带动软管进行作业,避免了混凝土在落入建筑地面是导致建筑工人深陷混凝土当中,建筑工人可以在无混凝土的地方进行行走,从而避免了浇筑混凝土缓慢的问题。
Concrete spray pipe for building construction
一种建筑施工用混凝土喷管
TANG QI (Autor:in) / DAI ZHAOWEI (Autor:in)
29.12.2020
Patent
Elektronische Ressource
Chinesisch
Combined concrete pipe pile for building construction
Europäisches Patentamt | 2021
|Combined concrete pipe pile for building construction
Europäisches Patentamt | 2023
|Combined concrete pipe pile for building construction
Europäisches Patentamt | 2020
|Green building concrete drainage pipe and construction method
Europäisches Patentamt | 2023
|High-bearing-capacity concrete pipe pile for building construction
Europäisches Patentamt | 2020
|