Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Building floor hoisting opening sealing structure
The invention provides a building floor hoisting opening sealing structure. The building floor hoisting opening sealing structure is suitable for sealing hoisting openings of basement materials and equipment in existing constructional engineering. The sealing structure comprises floor terraces and trusses; a hole is formed in the each of the floor terraces; One end of each of the trusses is fixedly connected with the wall building wall on one side face of each of the holes through a connecting part and is flush with the floor terrace along the horizontal plane. The other end of each of the trusses is fixedly connected with the wall building wall on the other side face of each of the holes through a connecting part and is flush with the floor terrace along the horizontal plane. By the adoption of the building floor hoisting opening sealing structure, holes of a hoisting opening in an existing floor terrace can be effectively sealed, so that the problems that labor and time are wasted when the hoisting opening is sealed, and economical efficiency is poor are solved; the problem that steel bars are difficult to recover in a conventional hoisting opening method is solved; and hole sealing is convenient and fast, the quality is guaranteed, and the economical efficiency is good.
本发明提供一种建筑楼层吊装口密封结构,适用于现有建筑工程中地下室材料、设备的吊装口密封;该密封结构包括楼层地坪和桁架,楼层地坪上设有洞口;桁架一端通过连接件固定连接于洞口一侧面的砌墙壁上,并与楼层地坪沿水平面平齐;桁架另一端通过连接件固定连接于洞口另一侧面的砌墙壁上,并与楼层地坪沿水平面平齐;采用上述方案,能够有效对现有楼层地坪上吊装口的洞口进行密封,解决了吊装口封闭费工费时、经济性差的问题,解决常规吊装口做法中钢筋恢复困难问题;洞口封闭方便快捷、质量有保证、经济性好。
Building floor hoisting opening sealing structure
The invention provides a building floor hoisting opening sealing structure. The building floor hoisting opening sealing structure is suitable for sealing hoisting openings of basement materials and equipment in existing constructional engineering. The sealing structure comprises floor terraces and trusses; a hole is formed in the each of the floor terraces; One end of each of the trusses is fixedly connected with the wall building wall on one side face of each of the holes through a connecting part and is flush with the floor terrace along the horizontal plane. The other end of each of the trusses is fixedly connected with the wall building wall on the other side face of each of the holes through a connecting part and is flush with the floor terrace along the horizontal plane. By the adoption of the building floor hoisting opening sealing structure, holes of a hoisting opening in an existing floor terrace can be effectively sealed, so that the problems that labor and time are wasted when the hoisting opening is sealed, and economical efficiency is poor are solved; the problem that steel bars are difficult to recover in a conventional hoisting opening method is solved; and hole sealing is convenient and fast, the quality is guaranteed, and the economical efficiency is good.
本发明提供一种建筑楼层吊装口密封结构,适用于现有建筑工程中地下室材料、设备的吊装口密封;该密封结构包括楼层地坪和桁架,楼层地坪上设有洞口;桁架一端通过连接件固定连接于洞口一侧面的砌墙壁上,并与楼层地坪沿水平面平齐;桁架另一端通过连接件固定连接于洞口另一侧面的砌墙壁上,并与楼层地坪沿水平面平齐;采用上述方案,能够有效对现有楼层地坪上吊装口的洞口进行密封,解决了吊装口封闭费工费时、经济性差的问题,解决常规吊装口做法中钢筋恢复困难问题;洞口封闭方便快捷、质量有保证、经济性好。
Building floor hoisting opening sealing structure
一种建筑楼层吊装口密封结构
CHEN KAI (Autor:in) / CHEN HAO (Autor:in) / GAO CHAO (Autor:in) / WANG YING (Autor:in) / SONG CHUNTAO (Autor:in) / DUAN LIANRUI (Autor:in) / JIAO YANG (Autor:in) / WANG QINGHAI (Autor:in) / HOU LIXIA (Autor:in)
05.01.2021
Patent
Elektronische Ressource
Chinesisch
Sealing device for outdoor top plate equipment hoisting opening
Europäisches Patentamt | 2024
|Assembly type large building floor hoisting equipment
Europäisches Patentamt | 2024
|Floor support plate hoisting mechanism for steel structure plant building
Europäisches Patentamt | 2023
|Hoisting pipe gallery pipeline joint sealing structure and hoisting pipe gallery
Europäisches Patentamt | 2023
|