Soft foundation replacing and filling structure and soft foundation replacing and filling method for stadium
The invention discloses a soft foundation replacing and filling structure for a stadium, which comprises a first geomembrane, a foam soft foundation pouring layer and a second geomembrane, on one hand, leakage after pouring of light soil can be avoided through the first geomembrane, and moisturizing maintenance can be performed on the top of the foam soft foundation pouring layer through the second geomembrane; on the other hand, by means of the foam soft foundation pouring layer, the load of the stadium is increased, and the stability of the foundation can be improved. The invention further discloses a soft foundation replacing and filling method of the stadium, the method is easy to operate and convenient to maintain, and the load of the stadium and the stability of the foundation can beimproved.
本发明公开了一种体育场的软基换填结构,其包括第一土工膜、泡沫软基浇筑层和第二土工膜,一方面,通过所述第一土工膜可以避免轻质土浇筑后出现渗漏,通过所述第二土工膜可以对所述泡沫软基浇筑层的顶部进行保湿养护;另一方面,通过所述泡沫软基浇筑层不仅提高体育场的荷载,还可以提高地基的稳定性。本发明还公开了一种体育场的软基换填方法,其操作简单、且便于养护,而且还可以提高体育场的荷载和地基的稳定性。
Soft foundation replacing and filling structure and soft foundation replacing and filling method for stadium
The invention discloses a soft foundation replacing and filling structure for a stadium, which comprises a first geomembrane, a foam soft foundation pouring layer and a second geomembrane, on one hand, leakage after pouring of light soil can be avoided through the first geomembrane, and moisturizing maintenance can be performed on the top of the foam soft foundation pouring layer through the second geomembrane; on the other hand, by means of the foam soft foundation pouring layer, the load of the stadium is increased, and the stability of the foundation can be improved. The invention further discloses a soft foundation replacing and filling method of the stadium, the method is easy to operate and convenient to maintain, and the load of the stadium and the stability of the foundation can beimproved.
本发明公开了一种体育场的软基换填结构,其包括第一土工膜、泡沫软基浇筑层和第二土工膜,一方面,通过所述第一土工膜可以避免轻质土浇筑后出现渗漏,通过所述第二土工膜可以对所述泡沫软基浇筑层的顶部进行保湿养护;另一方面,通过所述泡沫软基浇筑层不仅提高体育场的荷载,还可以提高地基的稳定性。本发明还公开了一种体育场的软基换填方法,其操作简单、且便于养护,而且还可以提高体育场的荷载和地基的稳定性。
Soft foundation replacing and filling structure and soft foundation replacing and filling method for stadium
一种体育场的软基换填结构和软基换填方法
LI XIANGQUAN (Autor:in) / TAN YIHONG (Autor:in) / LUO FUSHENG (Autor:in) / WU GUOBIN (Autor:in) / WU CHUZHOU (Autor:in) / DENG YANLONG (Autor:in) / QI GUANGMING (Autor:in) / LIU FUBIN (Autor:in)
29.01.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Replacing and filling method for treating municipal road soft soil foundation
Europäisches Patentamt | 2022
|Soft foundation replacement and filling construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|Soft foundation replacement and filling structure and construction method thereof