Step-by-step hoisting construction method for prefabricated beam of multilayer fabricated industrial factory building
The invention discloses a step-by-step hoisting construction method for a prefabricated beam of a multilayer fabricated industrial factory building. The step-by-step hoisting construction method comprises the following steps that (1), at least one truck crane is hoisted to a second floor; (2), at least one short barge truck is hoisted to the second floor; (3), the prefabricated beam is conveyed toa prefabricated beam placing position in front of each truck crane through a crawler crane and the short barge trucks; (4), a prefabricated beam is installed at the third floor by the truck cranes, after hoisting is completed, the crawler crane correspondingly hoists the truck cranes and the short barge trucks to the ground, and then the crawler crane hoists part of the prefabricated beams whichare not hoisted to the side span position; and (5), third-layer floor and column construction is carried out, and then the hoisting work from the step (1) to the step (4) is repeated till hoisting ofthe prefabricated beams of all floors is completed. The hoisting method can shorten the hoisting period of the prefabricated beams.
一种多层装配式工业厂房预制梁分步吊装施工方法,其步骤包括:1)将至少一台汽车吊吊装至第二层楼面;2)将至少一台短驳车吊装至第二层楼面上;3)通过履带式起重机将及短驳车将预制梁运送至每辆汽车吊前方预制梁放置处;4)汽车吊进行第三层楼面处的预制梁的安装;吊装完成后,履带式起重机将汽车吊及短驳车分别吊装至地面上,然后通过履带式起重机将未吊装到的部分边跨处的预制梁进行吊装;5)进行第三层楼面及柱施工,然后重复步骤1至4的吊装工作,直至完成所有楼层的预制梁的吊装。该吊装方法可缩短预制梁吊装工期。
Step-by-step hoisting construction method for prefabricated beam of multilayer fabricated industrial factory building
The invention discloses a step-by-step hoisting construction method for a prefabricated beam of a multilayer fabricated industrial factory building. The step-by-step hoisting construction method comprises the following steps that (1), at least one truck crane is hoisted to a second floor; (2), at least one short barge truck is hoisted to the second floor; (3), the prefabricated beam is conveyed toa prefabricated beam placing position in front of each truck crane through a crawler crane and the short barge trucks; (4), a prefabricated beam is installed at the third floor by the truck cranes, after hoisting is completed, the crawler crane correspondingly hoists the truck cranes and the short barge trucks to the ground, and then the crawler crane hoists part of the prefabricated beams whichare not hoisted to the side span position; and (5), third-layer floor and column construction is carried out, and then the hoisting work from the step (1) to the step (4) is repeated till hoisting ofthe prefabricated beams of all floors is completed. The hoisting method can shorten the hoisting period of the prefabricated beams.
一种多层装配式工业厂房预制梁分步吊装施工方法,其步骤包括:1)将至少一台汽车吊吊装至第二层楼面;2)将至少一台短驳车吊装至第二层楼面上;3)通过履带式起重机将及短驳车将预制梁运送至每辆汽车吊前方预制梁放置处;4)汽车吊进行第三层楼面处的预制梁的安装;吊装完成后,履带式起重机将汽车吊及短驳车分别吊装至地面上,然后通过履带式起重机将未吊装到的部分边跨处的预制梁进行吊装;5)进行第三层楼面及柱施工,然后重复步骤1至4的吊装工作,直至完成所有楼层的预制梁的吊装。该吊装方法可缩短预制梁吊装工期。
Step-by-step hoisting construction method for prefabricated beam of multilayer fabricated industrial factory building
一种多层装配式工业厂房预制梁分步吊装施工方法
WU HAN (Autor:in) / SONG QIANJUN (Autor:in) / SU YANG (Autor:in) / ZHENG PENG (Autor:in) / CHE QIJIE (Autor:in)
05.03.2021
Patent
Elektronische Ressource
Chinesisch
Europäisches Patentamt | 2021
|Hoisting device for fabricated building prefabricated parts
Europäisches Patentamt | 2024
|Hoisting equipment for prefabricated part of fabricated building
Europäisches Patentamt | 2021
|Multifunctional hoisting device for fabricated building prefabricated parts
Europäisches Patentamt | 2022
|Hoisting and aligning device for fabricated building prefabricated parts
Europäisches Patentamt | 2023
|