Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Bedding mortar protection device for prefabricated bent cap and prefabricated stand column and construction method thereof
The invention provides a bedding mortar protection device for a prefabricated bent cap and a prefabricated stand column, which is arranged at the joint of the prefabricated stand column and the prefabricated bent cap, and comprises a plurality of protection pieces which are connected with one another and define an accommodating cavity; each protective part comprises a first mounting panel and a second mounting panel which is connected to the top end of the first mounting panel and is far away from the accommodating cavity; and a locking assembly, the first end of the locking assembly is connected with the first mounting panel, and the second end of the locking assembly is connected with the second mounting panel. The technical problem that bedding slurry overflows is solved, and the technical effect of improving bedding slurry efficiency is achieved.
本发明提供了一种预制盖梁和预制立柱的坐浆防护装置,所述坐浆防护装置安装于预制立柱与预制盖梁的连接处,包括:多个防护件,互相连接且围成容纳腔;每个所述防护件分别包括第一安装面板,以及连接在所述第一安装面板顶端远离所述容纳腔的第二安装面板;锁紧组件,所述锁紧组件的第一端连接所述第一安装面板,所述锁紧组件的第二端连接所述第二安装面板。本发明解决了坐浆液溢出的技术问题,达到提高坐浆效率的技术效果。
Bedding mortar protection device for prefabricated bent cap and prefabricated stand column and construction method thereof
The invention provides a bedding mortar protection device for a prefabricated bent cap and a prefabricated stand column, which is arranged at the joint of the prefabricated stand column and the prefabricated bent cap, and comprises a plurality of protection pieces which are connected with one another and define an accommodating cavity; each protective part comprises a first mounting panel and a second mounting panel which is connected to the top end of the first mounting panel and is far away from the accommodating cavity; and a locking assembly, the first end of the locking assembly is connected with the first mounting panel, and the second end of the locking assembly is connected with the second mounting panel. The technical problem that bedding slurry overflows is solved, and the technical effect of improving bedding slurry efficiency is achieved.
本发明提供了一种预制盖梁和预制立柱的坐浆防护装置,所述坐浆防护装置安装于预制立柱与预制盖梁的连接处,包括:多个防护件,互相连接且围成容纳腔;每个所述防护件分别包括第一安装面板,以及连接在所述第一安装面板顶端远离所述容纳腔的第二安装面板;锁紧组件,所述锁紧组件的第一端连接所述第一安装面板,所述锁紧组件的第二端连接所述第二安装面板。本发明解决了坐浆液溢出的技术问题,达到提高坐浆效率的技术效果。
Bedding mortar protection device for prefabricated bent cap and prefabricated stand column and construction method thereof
一种预制盖梁和预制立柱的坐浆防护装置及其施工方法
WANG YANQIANG (Autor:in) / LIANG HUI (Autor:in) / LI DEKUN (Autor:in) / CAI XUEFENG (Autor:in) / XIANG KAO (Autor:in) / SONG WENMING (Autor:in) / WANG CHANGYIN (Autor:in) / LI LIANGLIANG (Autor:in) / ZHENG XUEJIN (Autor:in)
09.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Europäisches Patentamt | 2020
|Splicing adjustment method for prefabricated bent cap and prefabricated stand column
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|