Combined hoisting wall and mounting method
The invention discloses a combined hoisting wall, and belongs to the technical field of hoisting walls. The combined hoisting wall comprises a first prefabricated slab, a second prefabricated slab anda steel beam, wherein fixed rings are fixedly arranged on the upper and lower surfaces of the steel beam, traction steel ropes are fixedly installed on the outer surfaces of the fixed rings, and tightening rings are fixedly installed on one end of the traction steel ropes. According to the combined hoisting wall, the steel beam, channel steel, the first prefabricated slab, the second prefabricated slab and the traction steel ropes are installed, and the interior of the second prefabricated slab is rotated, so that the second prefabricated slab is fixed; when the second prefabricated slab needs to be removed and a positioning bolt is rotated out of a threaded cap, the positioning bolt is prevented from falling off when not in use; and the problems that a traditional hoisting wall does nothave a combination function, hoisting plates are hoisted one by one during prefabricated wallboard construction, time is wasted, the working efficiency is reduced and large-area operation is not facilitated are solved, and the effects of practicability and high working efficiency are achieved.
本发明公开了一种组合式吊装墙体,属于吊装墙体技术领域,包括第一预制板、第二预制板、第二预制板和钢梁,所述钢梁的上下表面均固定安装有固定环,所述固定环的外表面固定安装有牵引钢索,所述牵引钢索的一端固定安装有束紧环。本发明中,通过安装有钢梁、槽钢、第一预制板、第二预制板和牵引钢索,转动至第二预制板的内部,从而实现对第二预制板的固定,当需要将第二预制板拆卸下时,当定位螺栓从螺纹帽中转出时,避免定位螺栓在无需使用时掉落,解决了传统的吊装墙体不具有组合的功能,在对预制墙板施工及吊板都是一块一吊,浪费时间,降低了工作效率,不利于工作大面积的作业的问题,较为实用,工作效率较高。
Combined hoisting wall and mounting method
The invention discloses a combined hoisting wall, and belongs to the technical field of hoisting walls. The combined hoisting wall comprises a first prefabricated slab, a second prefabricated slab anda steel beam, wherein fixed rings are fixedly arranged on the upper and lower surfaces of the steel beam, traction steel ropes are fixedly installed on the outer surfaces of the fixed rings, and tightening rings are fixedly installed on one end of the traction steel ropes. According to the combined hoisting wall, the steel beam, channel steel, the first prefabricated slab, the second prefabricated slab and the traction steel ropes are installed, and the interior of the second prefabricated slab is rotated, so that the second prefabricated slab is fixed; when the second prefabricated slab needs to be removed and a positioning bolt is rotated out of a threaded cap, the positioning bolt is prevented from falling off when not in use; and the problems that a traditional hoisting wall does nothave a combination function, hoisting plates are hoisted one by one during prefabricated wallboard construction, time is wasted, the working efficiency is reduced and large-area operation is not facilitated are solved, and the effects of practicability and high working efficiency are achieved.
本发明公开了一种组合式吊装墙体,属于吊装墙体技术领域,包括第一预制板、第二预制板、第二预制板和钢梁,所述钢梁的上下表面均固定安装有固定环,所述固定环的外表面固定安装有牵引钢索,所述牵引钢索的一端固定安装有束紧环。本发明中,通过安装有钢梁、槽钢、第一预制板、第二预制板和牵引钢索,转动至第二预制板的内部,从而实现对第二预制板的固定,当需要将第二预制板拆卸下时,当定位螺栓从螺纹帽中转出时,避免定位螺栓在无需使用时掉落,解决了传统的吊装墙体不具有组合的功能,在对预制墙板施工及吊板都是一块一吊,浪费时间,降低了工作效率,不利于工作大面积的作业的问题,较为实用,工作效率较高。
Combined hoisting wall and mounting method
一种组合式吊装墙体及安装方法
ZHU HUANJIE (Autor:in) / LU BIN (Autor:in) / ZHAO BIN (Autor:in) / LU YAOWU (Autor:in) / QIN ZHENHUA (Autor:in) / ZHOU SIQI (Autor:in)
26.03.2021
Patent
Elektronische Ressource
Chinesisch
Fabricated outer wall hoisting and mounting construction method
Europäisches Patentamt | 2021
|Mounting and hoisting equipment for outer wall protective net
Europäisches Patentamt | 2024
|Unit type curtain wall track hoisting device and mounting method thereof
Europäisches Patentamt | 2024
|