The invention discloses a construction method of a wet-laid waterproof and heat-insulating integrated plate, and relates to the field of building waterproof construction. The construction method comprises the following steps of S1, cleaning a to-be-constructed base layer; S2, carrying out node strengthening processing; S3, constructing a waterproof coating to form a waterproof coating base layer;S4, blending a binding material; S5, coating the bonding material and paving the plate; S6, welding the plate; and S7, conducting weld joint inspection. The step S5 is conducted through laying equipment of the waterproof and heat-insulating integrated plate. According to the construction method of the wet-laid waterproof and heat-insulating integrated plate, the laying equipment of the waterproofand heat-insulating integrated plate is adopted, laying and bonding of the plate can be automatically completed, and the construction method has the advantages of being high in automation degree and capable of obviously reducing labor intensity and is particularly suitable for the construction process of the waterproof and heat-insulating integrated plate.
本发明公开了一种湿铺防水保温一体板的施工方法,涉及建筑防水施工领域。该方案包括以下步骤:S1:待施工基层清理;S2:节点加强处理;S3:施工防水涂料,形成防水涂料基层;S4:调配粘结材料;S5:涂覆粘结材料并铺贴板材;S6:板材焊接;S7:焊缝检查;步骤S5通过防水保温一体板的铺设设备进行,该湿铺防水保温一体板的施工方法采用防水保温一体板的铺设设备,能自动化完成板材的铺设和粘结,具有自动化程度高、能明显降低劳动强度的优点,尤其适用于防水保温一体板的施工过程。
Construction method of wet-laid waterproof and heat-insulating integrated plate
The invention discloses a construction method of a wet-laid waterproof and heat-insulating integrated plate, and relates to the field of building waterproof construction. The construction method comprises the following steps of S1, cleaning a to-be-constructed base layer; S2, carrying out node strengthening processing; S3, constructing a waterproof coating to form a waterproof coating base layer;S4, blending a binding material; S5, coating the bonding material and paving the plate; S6, welding the plate; and S7, conducting weld joint inspection. The step S5 is conducted through laying equipment of the waterproof and heat-insulating integrated plate. According to the construction method of the wet-laid waterproof and heat-insulating integrated plate, the laying equipment of the waterproofand heat-insulating integrated plate is adopted, laying and bonding of the plate can be automatically completed, and the construction method has the advantages of being high in automation degree and capable of obviously reducing labor intensity and is particularly suitable for the construction process of the waterproof and heat-insulating integrated plate.
本发明公开了一种湿铺防水保温一体板的施工方法,涉及建筑防水施工领域。该方案包括以下步骤:S1:待施工基层清理;S2:节点加强处理;S3:施工防水涂料,形成防水涂料基层;S4:调配粘结材料;S5:涂覆粘结材料并铺贴板材;S6:板材焊接;S7:焊缝检查;步骤S5通过防水保温一体板的铺设设备进行,该湿铺防水保温一体板的施工方法采用防水保温一体板的铺设设备,能自动化完成板材的铺设和粘结,具有自动化程度高、能明显降低劳动强度的优点,尤其适用于防水保温一体板的施工过程。
Construction method of wet-laid waterproof and heat-insulating integrated plate
一种湿铺防水保温一体板的施工方法
ZOU XIANHUA (Autor:in) / ZHANG ZHIQIANG (Autor:in)
26.03.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
HEAT-INSULATING WATERPROOF STRUCTURE AND HEAT-INSULATING WATERPROOF METHOD
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2024
|Waterproof, heat-insulating and decorative integrated plate and preparation method thereof
Europäisches Patentamt | 2023
|Waterproof, heat-insulating and decorative integrated plate and preparation method thereof
Europäisches Patentamt | 2024
|HEAT INSULATING WATERPROOF STRUCTURE AND CONSTRUCTION METHOD
Europäisches Patentamt | 2022
|