Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Construction method of special-shaped concrete column
The invention relates to a construction method of a special-shaped concrete column. The construction method comprises the following steps that a first formwork and a second formwork are prepared, and the first formwork and the second formwork are in axial symmetry; according to a drawing, steel bar binding is conducted in the first formwork and the second formwork; the first formwork and the second formwork are spliced and supported; the spliced first formwork and second formwork are subjected to bare concrete pouring, and bare concrete is vibrated and maintained; and the first formwork and the second formwork are dismounted. According to the construction method of the special-shaped concrete column, the shaped formworks are adopted for splicing construction, and the construction efficiency is improved; the spliced first formwork and second formwork are supported, and the construction safety is improved; and the spliced first formwork and second formwork are subjected to bare concrete pouring, vibrated and maintained, so that the structural integrity of the special-shaped concrete column is good, and the safety of the whole construction process can be improved.
本发明涉及一种异型混凝土柱的施工方法。该施工方法包括以下步骤:制备第一模板和第二模板,所述第一模板和所述第二模板轴对称;根据图纸,分别在所述第一模板和所述第二模板内进行钢筋绑扎;将所述第一模板和所述第二模板进行拼接,并进行支撑;对拼接后的所述第一模板和所述第二模板进行清水混凝土浇筑,并对清水混凝土进行振捣和养护;拆除第一模板和第二模板。上述异型混凝土柱的施工方法,采用定型化模板进行拼接施工,提高施工效率,且对拼接后的第一模板和第二模板进行支撑,提高施工安全性,通过对拼接后的第一模板和第二模板进行清水混凝土浇筑,并进行振捣和养护,使得异型混凝土柱的结构整体性好,且能够提高整个施工过程的安全性。
Construction method of special-shaped concrete column
The invention relates to a construction method of a special-shaped concrete column. The construction method comprises the following steps that a first formwork and a second formwork are prepared, and the first formwork and the second formwork are in axial symmetry; according to a drawing, steel bar binding is conducted in the first formwork and the second formwork; the first formwork and the second formwork are spliced and supported; the spliced first formwork and second formwork are subjected to bare concrete pouring, and bare concrete is vibrated and maintained; and the first formwork and the second formwork are dismounted. According to the construction method of the special-shaped concrete column, the shaped formworks are adopted for splicing construction, and the construction efficiency is improved; the spliced first formwork and second formwork are supported, and the construction safety is improved; and the spliced first formwork and second formwork are subjected to bare concrete pouring, vibrated and maintained, so that the structural integrity of the special-shaped concrete column is good, and the safety of the whole construction process can be improved.
本发明涉及一种异型混凝土柱的施工方法。该施工方法包括以下步骤:制备第一模板和第二模板,所述第一模板和所述第二模板轴对称;根据图纸,分别在所述第一模板和所述第二模板内进行钢筋绑扎;将所述第一模板和所述第二模板进行拼接,并进行支撑;对拼接后的所述第一模板和所述第二模板进行清水混凝土浇筑,并对清水混凝土进行振捣和养护;拆除第一模板和第二模板。上述异型混凝土柱的施工方法,采用定型化模板进行拼接施工,提高施工效率,且对拼接后的第一模板和第二模板进行支撑,提高施工安全性,通过对拼接后的第一模板和第二模板进行清水混凝土浇筑,并进行振捣和养护,使得异型混凝土柱的结构整体性好,且能够提高整个施工过程的安全性。
Construction method of special-shaped concrete column
异型混凝土柱的施工方法
ZHANG XINYAN (Autor:in) / HU KE (Autor:in) / GE XINGHAI (Autor:in) / GU CHUNFENG (Autor:in)
20.04.2021
Patent
Elektronische Ressource
Chinesisch
Construction method of independent special-shaped bare concrete column
Europäisches Patentamt | 2022
|Special-shaped steel pipe column concrete construction structure and construction method
Europäisches Patentamt | 2022
|Special-shaped concrete column curing device on construction site
Europäisches Patentamt | 2023
|Spatial special-shaped concrete tower column cable-stayed buckling construction method
Europäisches Patentamt | 2023
|