BIM assisted vertical mill construction method
The invention discloses a BIM assisted vertical mill construction method. The invention includes the following steps that firstly, a vertical mill is integrally modeled according to the design size of a vertical mill drawing, the elevation of a concrete surface is determined, and a vertical mill bolt fixing bracket and a bolt in a BIM model are marked in the drawing; through BIM modeling, unclear parts in a design drawing are eliminated, and what marked in the drawing is what needing to be constructed; and through the BIM model and actual process sequence, the construction of vertical mill bolt frames and bottom plate reinforcing steel bars, the construction of bolt assembly frames and the bolts, the construction of framework reinforcing steel bars, the construction of foundation top reinforcing steel bars, bolt correction and upper structure reinforcing steel bar insertion are clear, and finally acceptance check, reinforcement and concrete pouring are conducted. The whole vertical mill construction process is visualized and simulated, and the construction process is optimized, so that technicians and constructors lacking construction experience can accurately construct large equipment foundations such as the vertical mill. Construction is convenient and fast, the quality is reliable, the accuracy and the programming of vertical mill foundation construction are greatly improved, the construction cost is reduced, and the construction period is shortened.
本发明公开了一种BIM辅助立磨施工的方法,先根据立磨图纸设计尺寸将立磨整体建模,将砼面标高明确,将立磨螺栓固定支架和螺栓在图纸在BIM模型中标示出。通过BIM建模消除设计图纸中的不够明确之处,所见即所得。并通过BIM模型和实际工艺顺序,明确施工立磨螺栓框架和底板钢筋、施工螺栓组架和螺栓、施工骨架钢筋、施工基础顶部钢筋、螺栓校正、上部结构钢筋插筋,最后进行验收加固浇筑砼。整体立磨施工流程全部可视化,模拟化,对施工流程进行了优化,让施工经验缺乏的技术人员和施工人员都能准确的施工立磨等大型设备基础。施工方便快捷,质量可靠,而且大大提高了立磨基础施工的准确度和程序化,降低了施工成本,缩短了工期。
BIM assisted vertical mill construction method
The invention discloses a BIM assisted vertical mill construction method. The invention includes the following steps that firstly, a vertical mill is integrally modeled according to the design size of a vertical mill drawing, the elevation of a concrete surface is determined, and a vertical mill bolt fixing bracket and a bolt in a BIM model are marked in the drawing; through BIM modeling, unclear parts in a design drawing are eliminated, and what marked in the drawing is what needing to be constructed; and through the BIM model and actual process sequence, the construction of vertical mill bolt frames and bottom plate reinforcing steel bars, the construction of bolt assembly frames and the bolts, the construction of framework reinforcing steel bars, the construction of foundation top reinforcing steel bars, bolt correction and upper structure reinforcing steel bar insertion are clear, and finally acceptance check, reinforcement and concrete pouring are conducted. The whole vertical mill construction process is visualized and simulated, and the construction process is optimized, so that technicians and constructors lacking construction experience can accurately construct large equipment foundations such as the vertical mill. Construction is convenient and fast, the quality is reliable, the accuracy and the programming of vertical mill foundation construction are greatly improved, the construction cost is reduced, and the construction period is shortened.
本发明公开了一种BIM辅助立磨施工的方法,先根据立磨图纸设计尺寸将立磨整体建模,将砼面标高明确,将立磨螺栓固定支架和螺栓在图纸在BIM模型中标示出。通过BIM建模消除设计图纸中的不够明确之处,所见即所得。并通过BIM模型和实际工艺顺序,明确施工立磨螺栓框架和底板钢筋、施工螺栓组架和螺栓、施工骨架钢筋、施工基础顶部钢筋、螺栓校正、上部结构钢筋插筋,最后进行验收加固浇筑砼。整体立磨施工流程全部可视化,模拟化,对施工流程进行了优化,让施工经验缺乏的技术人员和施工人员都能准确的施工立磨等大型设备基础。施工方便快捷,质量可靠,而且大大提高了立磨基础施工的准确度和程序化,降低了施工成本,缩短了工期。
BIM assisted vertical mill construction method
一种BIM辅助立磨施工的方法
AN ZHIRONG (Autor:in) / LIU WEI (Autor:in)
23.04.2021
Patent
Elektronische Ressource
Chinesisch
Modularized construction equipment and construction method for vertical rolling mill foundation
Europäisches Patentamt | 2023
|Secondary grouting construction method for side wall of vertical rolling mill
Europäisches Patentamt | 2024
|Experimental Study on Improvement of Construction Performance of Vertical Mill Cement
British Library Conference Proceedings | 1993
|