System for increasing construction lift top cantilever end wall tying through standard knots and installation method
The invention provides a system for increasing construction lift top cantilever end wall tying through standard knots and an installation method. The system comprises first standard knots connected to a lifting cage on the first standard knots and second standard knots connected with the first standard knots. According to the system for increasing construction lift top cantilever end wall tying through the standard knots and the installation method, the second standard knots are arranged on a roof panel, and the tops of the first standard knots are connected with the upper portions of the second standard knots through wall tying pieces, so that the capacity of an cantilever end of the tops of the first standard knots for resisting wind loads and other horizontal effects is improved, and the safety and stability of a construction lift in the using process are improved; and the system for increasing construction lift top cantilever end wall tying through the standard knots and the installation method are particularly suitable for areas with large wind loads and the situation that the length of a cantilever of the cantilever end of tops of the standard knots of the construction lift is too large due to the fact that a roof parapet wall is too high.
本发明提供了一种利用标准节增加施工升顶部悬臂端附墙的系统及安装方法,包括:第一标准节;连接于所述第一标准节上的吊笼;与第一标准节连接的第二标准节。本发明通过在屋面板上设置第二标准节,并通过附墙件将第一标准节顶部与第二标准节上部相连,从而增加第一标准节顶部悬臂端抵抗风荷载等水平作用的能力,提高施工升降机使用过程中的安全性和稳定性,尤其适用于风荷载较大的地区以及由于屋面女儿墙高度过高而导致的施工升降机标准节顶部悬臂端悬臂长度过大的情况。
System for increasing construction lift top cantilever end wall tying through standard knots and installation method
The invention provides a system for increasing construction lift top cantilever end wall tying through standard knots and an installation method. The system comprises first standard knots connected to a lifting cage on the first standard knots and second standard knots connected with the first standard knots. According to the system for increasing construction lift top cantilever end wall tying through the standard knots and the installation method, the second standard knots are arranged on a roof panel, and the tops of the first standard knots are connected with the upper portions of the second standard knots through wall tying pieces, so that the capacity of an cantilever end of the tops of the first standard knots for resisting wind loads and other horizontal effects is improved, and the safety and stability of a construction lift in the using process are improved; and the system for increasing construction lift top cantilever end wall tying through the standard knots and the installation method are particularly suitable for areas with large wind loads and the situation that the length of a cantilever of the cantilever end of tops of the standard knots of the construction lift is too large due to the fact that a roof parapet wall is too high.
本发明提供了一种利用标准节增加施工升顶部悬臂端附墙的系统及安装方法,包括:第一标准节;连接于所述第一标准节上的吊笼;与第一标准节连接的第二标准节。本发明通过在屋面板上设置第二标准节,并通过附墙件将第一标准节顶部与第二标准节上部相连,从而增加第一标准节顶部悬臂端抵抗风荷载等水平作用的能力,提高施工升降机使用过程中的安全性和稳定性,尤其适用于风荷载较大的地区以及由于屋面女儿墙高度过高而导致的施工升降机标准节顶部悬臂端悬臂长度过大的情况。
System for increasing construction lift top cantilever end wall tying through standard knots and installation method
利用标准节增加施工升顶部悬臂端附墙的系统及安装方法
ZHU XIAOXUAN (Autor:in) / CHEN GUOXIANG (Autor:in) / XU YIFAN (Autor:in) / WANG XIAOLIN (Autor:in) / ZHU HANXIAO (Autor:in) / TANG JINQIANG (Autor:in)
30.04.2021
Patent
Elektronische Ressource
Chinesisch
Wiley | 2005
|British Library Online Contents | 2013
|High-altitude cantilever structure curtain wall installation construction method
Europäisches Patentamt | 2022
|Cantilever scaffold for curtain wall installation and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2020
|