Steel structure bridge assembly construction method
The invention relates to a steel structure bridge assembly construction method. Assembly construction of a steel structure bridge is completed through cooperation of a fixing device, a clamping device and a hoisting device. According to the steel structure bridge assembly construction method, the problems that when steel is manually hoisted, the steel is heavy, the manual hoisting speed is low, accidents such as steel falling are likely to happen during manual hoisting, potential safety hazards exist, and due to the fact that the steel hoisting amount is large, the manual hoisting speed is low, when existing steel structure bridge construction equipment is assembled and constructed, steel is usually hoisted to an installation position through an instrument, then the installation angle of the steel is manually adjusted, and the like, and due to the fact that the steel is heavy in weight and large in size, the manual installation angle adjusting process is tedious, and the construction efficiency of the steel structure bridge is reduced are solved.
本发明涉及一种钢构桥梁装配施工方法,通过设有的固定装置、夹持装置和吊升装置协同完成钢构桥梁的装配施工。本发明提供的一种钢构桥梁装配施工方法,可以解决人工吊装钢材时,钢材质量较重,使得人工吊装速度慢,且人工吊装时易发生钢材脱落等事故,存在安全隐患,且由于钢材吊装量较大,从而使得人工吊装速度慢,进而导致钢构桥梁的施工效率以及现有钢构桥梁施工设备在装配施工时,通常只通过器械将钢材吊装至安装位置,再通过人工调整钢材的安装角度等,由于钢材质量重、体积大,人工调整安装角度过程繁琐,从而降低钢构桥梁的施工效率等问题。
Steel structure bridge assembly construction method
The invention relates to a steel structure bridge assembly construction method. Assembly construction of a steel structure bridge is completed through cooperation of a fixing device, a clamping device and a hoisting device. According to the steel structure bridge assembly construction method, the problems that when steel is manually hoisted, the steel is heavy, the manual hoisting speed is low, accidents such as steel falling are likely to happen during manual hoisting, potential safety hazards exist, and due to the fact that the steel hoisting amount is large, the manual hoisting speed is low, when existing steel structure bridge construction equipment is assembled and constructed, steel is usually hoisted to an installation position through an instrument, then the installation angle of the steel is manually adjusted, and the like, and due to the fact that the steel is heavy in weight and large in size, the manual installation angle adjusting process is tedious, and the construction efficiency of the steel structure bridge is reduced are solved.
本发明涉及一种钢构桥梁装配施工方法,通过设有的固定装置、夹持装置和吊升装置协同完成钢构桥梁的装配施工。本发明提供的一种钢构桥梁装配施工方法,可以解决人工吊装钢材时,钢材质量较重,使得人工吊装速度慢,且人工吊装时易发生钢材脱落等事故,存在安全隐患,且由于钢材吊装量较大,从而使得人工吊装速度慢,进而导致钢构桥梁的施工效率以及现有钢构桥梁施工设备在装配施工时,通常只通过器械将钢材吊装至安装位置,再通过人工调整钢材的安装角度等,由于钢材质量重、体积大,人工调整安装角度过程繁琐,从而降低钢构桥梁的施工效率等问题。
Steel structure bridge assembly construction method
一种钢构桥梁装配施工方法
LI CHENGCUI (Autor:in) / LIAO YULIN (Autor:in)
04.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01D
BRIDGES
,
Brücken
Construction method of steel structure bridge and steel structure bridge
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2015
|