Pipe supporting construction method for drainage casing pipe engineering
The invention discloses a pipe supporting construction method for drainage casing pipe engineering. The construction method comprises the following specific steps that 1, design disclosure is conducted by a design unit before engineering construction, and when the construction unit finds that a construction drawing has errors, the requirement for changing design is put forward to the design unit in time; 2, a technical leader leads engineering technicians to compile a special construction scheme for pipe supporting of the drainage casing pipe engineering according to the design drawing, and technical disclosure is conducted to the technicians and team members; and 3, before construction, a construction unit is promoted to organize related units to conduct on-site pile handing to the construction unit, arrangement of temporary benchmark points and pipeline axis control piles is convenient to observe and must be firm, protective measures are adopted, and a total station is used for conducting measurement and lofting on a construction route of the drainage casing pipe engineering. The pipe supporting construction method for the drainage casing pipe engineering is easy to operate, low in manufacturing cost and capable of achieving accurate positioning, improving the construction quality and construction safety, highlighting the design concept of energy conservation and environmental protection and saving manpower and material resources conveniently.
本发明公开了排水套管工程托管施工工法,具体施工工法步骤如下:步骤一:工程施工前应由设计单位进行设计交底,当施工单位发现施工图有错误时,应及时向设计单位提出变更设计的要求;步骤二:技术负责人带领工程技术人员应根据设计图纸编制排水套管工程托管专项施工方案,并且向技术人员及班组长进行技术交底;步骤三:施工前,促请建设单位组织有关单位向施工单位进行现场交桩,临时水准点和管道轴线控制桩的设置应便于观测且必须牢固,并采用保护措施,用全站仪对排水套管工程施工路线进行测量放样。该排水套管工程托管施工工法操作简单,造价低,能准确定位,能提高施工质量,提高施工安全性,彰显了节能环保的设计理念,便于节省人力物力。
Pipe supporting construction method for drainage casing pipe engineering
The invention discloses a pipe supporting construction method for drainage casing pipe engineering. The construction method comprises the following specific steps that 1, design disclosure is conducted by a design unit before engineering construction, and when the construction unit finds that a construction drawing has errors, the requirement for changing design is put forward to the design unit in time; 2, a technical leader leads engineering technicians to compile a special construction scheme for pipe supporting of the drainage casing pipe engineering according to the design drawing, and technical disclosure is conducted to the technicians and team members; and 3, before construction, a construction unit is promoted to organize related units to conduct on-site pile handing to the construction unit, arrangement of temporary benchmark points and pipeline axis control piles is convenient to observe and must be firm, protective measures are adopted, and a total station is used for conducting measurement and lofting on a construction route of the drainage casing pipe engineering. The pipe supporting construction method for the drainage casing pipe engineering is easy to operate, low in manufacturing cost and capable of achieving accurate positioning, improving the construction quality and construction safety, highlighting the design concept of energy conservation and environmental protection and saving manpower and material resources conveniently.
本发明公开了排水套管工程托管施工工法,具体施工工法步骤如下:步骤一:工程施工前应由设计单位进行设计交底,当施工单位发现施工图有错误时,应及时向设计单位提出变更设计的要求;步骤二:技术负责人带领工程技术人员应根据设计图纸编制排水套管工程托管专项施工方案,并且向技术人员及班组长进行技术交底;步骤三:施工前,促请建设单位组织有关单位向施工单位进行现场交桩,临时水准点和管道轴线控制桩的设置应便于观测且必须牢固,并采用保护措施,用全站仪对排水套管工程施工路线进行测量放样。该排水套管工程托管施工工法操作简单,造价低,能准确定位,能提高施工质量,提高施工安全性,彰显了节能环保的设计理念,便于节省人力物力。
Pipe supporting construction method for drainage casing pipe engineering
排水套管工程托管施工工法
25.06.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E03F
SEWERS
,
Abwasserkanäle
Drainage pipe construction device and drainage pipe construction method
Europäisches Patentamt | 2020
|Roof casing pipe construction technology capable of limiting perpendicularity of casing pipe
Europäisches Patentamt | 2023
|MICROPILE CASING PIPE AND CONSTRUCTION METHOD FOR MICROPILE CASING