The invention relates to a pouring forming method for a steel bar truss floor support plate. The pouring forming method mainly comprises the following steps of equipment inspection, adjusting and filling, cement laying and cement flattening. Cement pouring equipment for the steel bar truss floor support plate comprises a movable base, a movable rotating wheel, a spraying assembly and a slicking assembly, wherein the movable rotating wheels are evenly installed on the movable base in a rotating connection mode, the spraying assembly is installed on the movable base, and the slicking assembly is arranged on the left side of the spraying assembly and installed on the lower end surface of the movable base. The pouring forming method can solve the following problems existing during cement pouring of the steel bar truss floor support plate: a, the existing steel bar truss floor support plate needs to be manually slicked after cement pouring, so that the workload of workers is increased; and b, when the existing steel bar truss floor support plate is subjected to cement pouring, large cement blocks which are bonded together are often laid above the steel bar truss floor support plate, then air exists in cement, the ground cracks, and the building quality is affected.
本发明涉及一种钢筋桁架楼承板浇筑成型方法,主要包括以下步骤:设备检查、调节填充、水泥铺设和水泥铺平,钢筋桁架楼承板水泥浇筑设备包括移动底座、移动转轮、喷射组件和刮平组件,移动底座上通过转动连接的方式均匀安装有移动转轮,移动底座上安装有喷射组件,喷射组件左侧设置有刮平组件,刮平组件安装在移动底座下端面上,本发明可以解决钢筋桁架楼承板在进行水泥浇筑时存在的以下问题:a:现钢筋桁架楼承板在进行水泥浇筑后需人工刮平,增加了员工们的工作量;b:现钢筋桁架楼承板在进行水泥浇筑时,常有粘合在一起的大块水泥块铺设到钢筋桁架楼承板上方,进而水泥内部存在空气,后地面会出现开裂的情况,影响建筑质量。
The invention relates to a pouring forming method for a steel bar truss floor support plate. The pouring forming method mainly comprises the following steps of equipment inspection, adjusting and filling, cement laying and cement flattening. Cement pouring equipment for the steel bar truss floor support plate comprises a movable base, a movable rotating wheel, a spraying assembly and a slicking assembly, wherein the movable rotating wheels are evenly installed on the movable base in a rotating connection mode, the spraying assembly is installed on the movable base, and the slicking assembly is arranged on the left side of the spraying assembly and installed on the lower end surface of the movable base. The pouring forming method can solve the following problems existing during cement pouring of the steel bar truss floor support plate: a, the existing steel bar truss floor support plate needs to be manually slicked after cement pouring, so that the workload of workers is increased; and b, when the existing steel bar truss floor support plate is subjected to cement pouring, large cement blocks which are bonded together are often laid above the steel bar truss floor support plate, then air exists in cement, the ground cracks, and the building quality is affected.
本发明涉及一种钢筋桁架楼承板浇筑成型方法,主要包括以下步骤:设备检查、调节填充、水泥铺设和水泥铺平,钢筋桁架楼承板水泥浇筑设备包括移动底座、移动转轮、喷射组件和刮平组件,移动底座上通过转动连接的方式均匀安装有移动转轮,移动底座上安装有喷射组件,喷射组件左侧设置有刮平组件,刮平组件安装在移动底座下端面上,本发明可以解决钢筋桁架楼承板在进行水泥浇筑时存在的以下问题:a:现钢筋桁架楼承板在进行水泥浇筑后需人工刮平,增加了员工们的工作量;b:现钢筋桁架楼承板在进行水泥浇筑时,常有粘合在一起的大块水泥块铺设到钢筋桁架楼承板上方,进而水泥内部存在空气,后地面会出现开裂的情况,影响建筑质量。
Pouring forming method for steel bar truss floor support plate
一种钢筋桁架楼承板浇筑成型方法
WU JIANYU (Autor:in)
09.07.2021
Patent
Elektronische Ressource
Chinesisch
Pouring forming method for steel bar truss floor support plate
Europäisches Patentamt | 2023
|Improvement method of steel bar truss floor support plate and steel bar truss floor support plate
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|