Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Container yard upgrading and rebuilding structure
The invention provides a container yard upgrading and rebuilding structure which comprises an old base layer, a main road and a yard area are arranged on the old base layer, the main road is in a U shape, the yard area is located in the U shape of the main road and comprises a plurality of yard units arranged at intervals along a coastline, a conversion runway is arranged in the interval area between every two adjacent yard units, each yard unit comprises a plurality of yards which are arranged in parallel, each yard is parallel to the coastline, at least one traction lane is arranged in each yard, runway beams are arranged in the traction lanes, the extension directions of the traction lanes and the runway beams are consistent with the length directions of the yards, and the two runway beams on the same vertical plane are connected into a whole. The construction period can be shortened, the construction efficiency is improved, the construction cost is reduced, the operation capability is improved, and meanwhile the operation interruption time of a wharf can be shortened.
本发明提供了一种集装箱堆场升级改造结构,包括旧基层,旧基层上设有主干道和堆场区,主干道呈U型,堆场区位于主干道的U型内部,其包括若干沿海岸线间隔设置的堆场单元,相邻的两个堆场单元之间的间隔区域设有转换跑道,每个堆场单元包括多个平行布设的堆场,且每个堆场平行于海岸线,每个堆场中布置至少一个牵引车道,牵引车道中布置有跑道梁,牵引车道和跑道梁的延伸方向与堆场的长度方向一致,且位于同一竖直面上的两根跑道梁之间连接形成整体。本发明能缩短施工周期,提高施工效率,降低施工成本,提高运营能力的同时能把码头运营中断时间缩小。
Container yard upgrading and rebuilding structure
The invention provides a container yard upgrading and rebuilding structure which comprises an old base layer, a main road and a yard area are arranged on the old base layer, the main road is in a U shape, the yard area is located in the U shape of the main road and comprises a plurality of yard units arranged at intervals along a coastline, a conversion runway is arranged in the interval area between every two adjacent yard units, each yard unit comprises a plurality of yards which are arranged in parallel, each yard is parallel to the coastline, at least one traction lane is arranged in each yard, runway beams are arranged in the traction lanes, the extension directions of the traction lanes and the runway beams are consistent with the length directions of the yards, and the two runway beams on the same vertical plane are connected into a whole. The construction period can be shortened, the construction efficiency is improved, the construction cost is reduced, the operation capability is improved, and meanwhile the operation interruption time of a wharf can be shortened.
本发明提供了一种集装箱堆场升级改造结构,包括旧基层,旧基层上设有主干道和堆场区,主干道呈U型,堆场区位于主干道的U型内部,其包括若干沿海岸线间隔设置的堆场单元,相邻的两个堆场单元之间的间隔区域设有转换跑道,每个堆场单元包括多个平行布设的堆场,且每个堆场平行于海岸线,每个堆场中布置至少一个牵引车道,牵引车道中布置有跑道梁,牵引车道和跑道梁的延伸方向与堆场的长度方向一致,且位于同一竖直面上的两根跑道梁之间连接形成整体。本发明能缩短施工周期,提高施工效率,降低施工成本,提高运营能力的同时能把码头运营中断时间缩小。
Container yard upgrading and rebuilding structure
一种集装箱堆场升级改造结构
FENG GUANGHUA (Autor:in) / WU WEIJUN (Autor:in) / RONG JINGSONG (Autor:in) / ZHAO YAOPU (Autor:in) / LIU XING (Autor:in) / LIU XUEYANG (Autor:in) / HUANG GUOZHONG (Autor:in) / XU YINGJIE (Autor:in) / WANG MENG (Autor:in) / YAN HAN (Autor:in)
23.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
IuD Bahn | 2007
|Fabricated container corner foundation structure for transformation of container yard
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2022
|Northside Container Yard Port Canaveral, Florida
British Library Conference Proceedings | 1998
|