Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Vault supporting device and method for building construction
The invention discloses a vault supporting method for building construction. The method comprises the following steps that 1, a device is arranged below a vault to be supported; 2, adjustment is carried out on the device, and the size of the upper end face of the device is basically the same as that of the vault; 3, the device is started to ascend the device to support the vault; and 4, a construction device of the device is started so that the worker can carry out the required construction operation. The device has the advantages that supporting can be carried out, so that the supporting position makes full contact with the vault. The device comprises a movable supporting base, adjusting assemblies, supporting assemblies, the arc-shaped vault, a middle end limiting connecting plate and a lifting construction assembly, the supporting assemblies are fixedly connected to the upper end of the movable supporting base, the lifting construction assembly is fixedly connected to the upper end of the movable supporting base, and the two supporting assemblies are rotationally connected to the two adjusting assemblies correspondingly.
一种建筑施工拱顶支撑方法,该方法包括以下步骤:步骤一:将装置置于待支撑拱顶的下方;步骤二:对装置进行调整,使装置上端面的尺寸和拱顶基本相同;步骤三:启动装置使装置上升对拱顶进行支撑;步骤四:启动装置的施工装置能够工人能够进行要的施工操作;具有能够进行支撑使支撑位置和拱顶的充分接触的优点,包括移动支撑底座、调整组件、支撑组件、弧形拱顶、中端限定连接板和举升施工组件,支撑组件固定连接在移动支撑底座的上端,举升施工组件固定连接在移动支撑底座的上端,两个支撑组件分别转动连接在两个调整组件上。
Vault supporting device and method for building construction
The invention discloses a vault supporting method for building construction. The method comprises the following steps that 1, a device is arranged below a vault to be supported; 2, adjustment is carried out on the device, and the size of the upper end face of the device is basically the same as that of the vault; 3, the device is started to ascend the device to support the vault; and 4, a construction device of the device is started so that the worker can carry out the required construction operation. The device has the advantages that supporting can be carried out, so that the supporting position makes full contact with the vault. The device comprises a movable supporting base, adjusting assemblies, supporting assemblies, the arc-shaped vault, a middle end limiting connecting plate and a lifting construction assembly, the supporting assemblies are fixedly connected to the upper end of the movable supporting base, the lifting construction assembly is fixedly connected to the upper end of the movable supporting base, and the two supporting assemblies are rotationally connected to the two adjusting assemblies correspondingly.
一种建筑施工拱顶支撑方法,该方法包括以下步骤:步骤一:将装置置于待支撑拱顶的下方;步骤二:对装置进行调整,使装置上端面的尺寸和拱顶基本相同;步骤三:启动装置使装置上升对拱顶进行支撑;步骤四:启动装置的施工装置能够工人能够进行要的施工操作;具有能够进行支撑使支撑位置和拱顶的充分接触的优点,包括移动支撑底座、调整组件、支撑组件、弧形拱顶、中端限定连接板和举升施工组件,支撑组件固定连接在移动支撑底座的上端,举升施工组件固定连接在移动支撑底座的上端,两个支撑组件分别转动连接在两个调整组件上。
Vault supporting device and method for building construction
一种建筑施工拱顶支撑装置及方法
WANG CHANGCAI (Autor:in)
23.07.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Vault bridge supporting building climbing frame device
Europäisches Patentamt | 2020
|Engineering Index Backfile | 1929
|Engineering Index Backfile | 1897
|Large-span column-free arc vault formwork supporting system and construction method
Europäisches Patentamt | 2024
|