Construction process of thermal insulation paste material internal thermal insulation system for wet part of wall body
The invention discloses a construction process of a thermal insulation paste material internal thermal insulation system for a wet part of a wall body. The construction process comprises the following steps that step 1, an inner side base layer wall surface is treated; step 2, vertical hoisting, square sleeving and control line snapping are carried out; step 3, interface slurry is locally smeared; step 4, the heat preservation paste material is pre-mixed; step 5, heat preservation paste is smeared in a layered mode; step 6, the thermal insulation layer is maintained; step 7, anti-crack mortar is mixed; 8, the anti-crack mortar is smeared once; step 9, alkali-resistant coating mesh cloth is laid and pressed; step 10, finishing is carried out with a waterproof coating; and step 11, a waterproof coating is brushed. The construction process is simple, in the construction process, the steps of smearing the heat preservation paste in a layered mode, maintaining the heat preservation layer and the like are carried out, and in the construction process, the alkali-resisting coating mesh cloth is laid and pressed, the waterproof coating is brushed, so that the heat preservation paste after construction is not prone to peeling, hollowing and the like, and the construction process is suitable for construction in places with wet walls.
本发明公开了一种墙体潮湿部位保温膏料内保温系统的施工工艺,步骤一:内侧基层墙面进行处理;步骤二、吊垂直、套方、弹控制线;步骤三、局部抹界面浆;步骤四、预拌保温膏料;步骤五、分层抹保温膏料;步骤六、保温层养护;步骤七、拌制抗裂砂浆;步骤八、抹一遍抗裂砂浆;步骤九、铺压耐碱涂覆网布;步骤十、防水型涂料饰面;步骤十一、涂刷防水型涂料。此种施工工艺简单,施工过程中进行分层抹保温膏料,保温层进行养护等步骤,并且施工过程中铺压耐碱涂覆网布,涂刷防水型涂料,因此施工后的保温膏料不容易出现掉皮,空鼓等现象,且适合墙体潮湿的地方施工。
Construction process of thermal insulation paste material internal thermal insulation system for wet part of wall body
The invention discloses a construction process of a thermal insulation paste material internal thermal insulation system for a wet part of a wall body. The construction process comprises the following steps that step 1, an inner side base layer wall surface is treated; step 2, vertical hoisting, square sleeving and control line snapping are carried out; step 3, interface slurry is locally smeared; step 4, the heat preservation paste material is pre-mixed; step 5, heat preservation paste is smeared in a layered mode; step 6, the thermal insulation layer is maintained; step 7, anti-crack mortar is mixed; 8, the anti-crack mortar is smeared once; step 9, alkali-resistant coating mesh cloth is laid and pressed; step 10, finishing is carried out with a waterproof coating; and step 11, a waterproof coating is brushed. The construction process is simple, in the construction process, the steps of smearing the heat preservation paste in a layered mode, maintaining the heat preservation layer and the like are carried out, and in the construction process, the alkali-resisting coating mesh cloth is laid and pressed, the waterproof coating is brushed, so that the heat preservation paste after construction is not prone to peeling, hollowing and the like, and the construction process is suitable for construction in places with wet walls.
本发明公开了一种墙体潮湿部位保温膏料内保温系统的施工工艺,步骤一:内侧基层墙面进行处理;步骤二、吊垂直、套方、弹控制线;步骤三、局部抹界面浆;步骤四、预拌保温膏料;步骤五、分层抹保温膏料;步骤六、保温层养护;步骤七、拌制抗裂砂浆;步骤八、抹一遍抗裂砂浆;步骤九、铺压耐碱涂覆网布;步骤十、防水型涂料饰面;步骤十一、涂刷防水型涂料。此种施工工艺简单,施工过程中进行分层抹保温膏料,保温层进行养护等步骤,并且施工过程中铺压耐碱涂覆网布,涂刷防水型涂料,因此施工后的保温膏料不容易出现掉皮,空鼓等现象,且适合墙体潮湿的地方施工。
Construction process of thermal insulation paste material internal thermal insulation system for wet part of wall body
一种墙体潮湿部位保温膏料内保温系统的施工工艺
YANG LIHENG (Autor:in) / YANG JIJIN (Autor:in)
06.08.2021
Patent
Elektronische Ressource
Chinesisch
Extruded sheet outer wall internal thermal insulation construction process
Europäisches Patentamt | 2023
|Thermal insulation tie part and thermal insulation wall
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2022
|