Construction method for steel sheet pile cofferdam in high-flow-speed sandy gravel area
The invention relates to a bridge bearing platform foundation construction technology, and particularly discloses a construction method for a steel sheet pile cofferdam in a high-flow-speed sandy gravel area. The construction method comprises the following steps that S1, a guide frame is positioned; S2, a streaming protection pile is inserted and driven; S3, steel sheet piles for positioning are inserted and driven; S4, a steel sheet pile cofferdam positioning guide frame is installed through a drilling platform; S5, other steel sheet piles are inserted and driven; S6, closing the steel sheet pile cofferdam; S7, enclosing purlins and inner supports are mounted; S8, bottom sealing concrete is poured; S9, a steel sheet pile cofferdam foundation pit is excavated; and S10, the steel sheet pile cofferdam is dismantled. The construction method for the steel sheet pile cofferdam in the high-flow-speed sandy gravel area is easy to operate, the construction process is safe and reliable, and the construction cost is low.
本发明涉及桥梁承台基础施工技术,具体公开了一种大流速砂卵石区域的钢板桩围堰施工方法,包括如下步骤:S1、导向架定位;S2、插打绕流防护桩;S3、插打用于定位的钢板桩;S4、利用钻孔平台安装钢板桩围堰定位导向架;S5、插打其他钢板桩;S6、钢板桩围堰合拢;S7、安装围檩和内支撑;S8、浇筑封底混凝土;S9、挖掘钢板桩围堰基坑;S10、钢板桩围堰拆除。本发明的大流速砂卵石区域的钢板桩围堰施工方法操作简单,施工过程安全可靠,施工费用低。
Construction method for steel sheet pile cofferdam in high-flow-speed sandy gravel area
The invention relates to a bridge bearing platform foundation construction technology, and particularly discloses a construction method for a steel sheet pile cofferdam in a high-flow-speed sandy gravel area. The construction method comprises the following steps that S1, a guide frame is positioned; S2, a streaming protection pile is inserted and driven; S3, steel sheet piles for positioning are inserted and driven; S4, a steel sheet pile cofferdam positioning guide frame is installed through a drilling platform; S5, other steel sheet piles are inserted and driven; S6, closing the steel sheet pile cofferdam; S7, enclosing purlins and inner supports are mounted; S8, bottom sealing concrete is poured; S9, a steel sheet pile cofferdam foundation pit is excavated; and S10, the steel sheet pile cofferdam is dismantled. The construction method for the steel sheet pile cofferdam in the high-flow-speed sandy gravel area is easy to operate, the construction process is safe and reliable, and the construction cost is low.
本发明涉及桥梁承台基础施工技术,具体公开了一种大流速砂卵石区域的钢板桩围堰施工方法,包括如下步骤:S1、导向架定位;S2、插打绕流防护桩;S3、插打用于定位的钢板桩;S4、利用钻孔平台安装钢板桩围堰定位导向架;S5、插打其他钢板桩;S6、钢板桩围堰合拢;S7、安装围檩和内支撑;S8、浇筑封底混凝土;S9、挖掘钢板桩围堰基坑;S10、钢板桩围堰拆除。本发明的大流速砂卵石区域的钢板桩围堰施工方法操作简单,施工过程安全可靠,施工费用低。
Construction method for steel sheet pile cofferdam in high-flow-speed sandy gravel area
TIAN ZHONGCHU / DING BINYANG / DAI YE / LUO YUMAN / GU YALI / YANG YIKE / LUO ZHAOHUA / CONG PEI / CAO HUI / TANG YU / LIU YUNLONG / PENG XUEJUN / LING TAO
Patent
Elektronische Ressource
Construction method of steel sheet pile cofferdam deeply covered with sandy gravel layer
Europäisches Patentamt | 2021
|Lassen steel sheet pile cofferdam construction method
Europäisches Patentamt | 2024
|