Construction method of super-flat floor
The invention relates to a construction method of a super-flat floor. The construction method comprises the following steps that an angle steel formwork is erected; concrete is poured into the angle steel formwork; the surface of the concrete is comprehensively leveled through a lengthened leveling ruler; after the concrete reaches an initial set state, the surface of the concrete is locally leveled through a push-pull ruler; the step of erecting the angle steel formwork further comprises the steps that angle steel is installed on the ground through a height-adjustable bolt assembly; the flatness of the upper surface of the angle steel is adjusted through the bolt assembly; the flatness of the upper surface of the angle steel is checked; and the angle steel is fixed according to a pouring elevation. By means of the technical scheme, the construction method of the super-flat floor can solve the technical problem that the flatness of the floor is insufficient.
本公开涉及一种超平地坪的施工方法,包括以下步骤:支设角钢模板;在所述角钢模板内浇筑混凝土;通过加长整平尺对混凝土的表面进行全面整平;以及当混凝土达到初凝状态后,通过推拉尺对混凝土的表面进行局部整平;其中,所述支设角钢模板的步骤还包括:将角钢通过高度可调的螺栓组件安装到地面上;通过所述螺栓组件调整所述角钢的上表面的平整度;校核所述角钢的上表面的平整度;以及根据浇筑标高固定所述角钢。通过上述技术方案,本公开提供的超平地坪的施工方法能够解决地坪平整度不足的技术问题。
Construction method of super-flat floor
The invention relates to a construction method of a super-flat floor. The construction method comprises the following steps that an angle steel formwork is erected; concrete is poured into the angle steel formwork; the surface of the concrete is comprehensively leveled through a lengthened leveling ruler; after the concrete reaches an initial set state, the surface of the concrete is locally leveled through a push-pull ruler; the step of erecting the angle steel formwork further comprises the steps that angle steel is installed on the ground through a height-adjustable bolt assembly; the flatness of the upper surface of the angle steel is adjusted through the bolt assembly; the flatness of the upper surface of the angle steel is checked; and the angle steel is fixed according to a pouring elevation. By means of the technical scheme, the construction method of the super-flat floor can solve the technical problem that the flatness of the floor is insufficient.
本公开涉及一种超平地坪的施工方法,包括以下步骤:支设角钢模板;在所述角钢模板内浇筑混凝土;通过加长整平尺对混凝土的表面进行全面整平;以及当混凝土达到初凝状态后,通过推拉尺对混凝土的表面进行局部整平;其中,所述支设角钢模板的步骤还包括:将角钢通过高度可调的螺栓组件安装到地面上;通过所述螺栓组件调整所述角钢的上表面的平整度;校核所述角钢的上表面的平整度;以及根据浇筑标高固定所述角钢。通过上述技术方案,本公开提供的超平地坪的施工方法能够解决地坪平整度不足的技术问题。
Construction method of super-flat floor
超平地坪的施工方法
XU CHANGSHENG (Autor:in)
17.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Construction method of VNA directional passing super-flat floor
Europäisches Patentamt | 2021
|Narrow roadway high-precision super-flat floor construction method
Europäisches Patentamt | 2021
|Super-flat floor suspended self-leveling construction device with high precision
Europäisches Patentamt | 2024
|