Shale brick terrace construction process during koji-making fermentation
The invention discloses a shale brick terrace construction process during koji-making fermentation. The shale brick terrace construction process comprises the following steps that leveling is carried out by paving dry and hard cement mortar with the thickness of 20 mm and sand in a ratio of 1: 2, shale bricks are paved with the size of 240 * 115 * 53, and the shale bricks are vertically paved in a staggered joint manner in the long side direction; the laying sequence is carried out from the door opening direction of a fermentation room to the window direction, finally, M7.5 masonry mortar is adopted for edge closing, vertical joints are fully filled with a mixture of cement, lime and fly ash with the ratio of 1: 2: 3, then a proper amount of water is sprinkled to make the mixture sink, then the mixture is filled and supplemented till brick joints are full, and finally, a polishing machine is used for polishing and clearing the shale brick floor surface. The construction process is simple, the construction period is short, the maintenance time is short, later maintenance is convenient, material preparation is convenient, and the construction cost is lower than that of a concrete terrace, so that terrace laying construction is greatly facilitated.
本发明公开了一种制曲发酵间页岩砖地坪施工工艺,是由铺设20mm厚水泥:砂子为1:2的干硬性水泥砂浆找平,铺排页岩砖尺寸为240×115×53,按长边方向竖向错缝铺排;铺排顺序由发酵间门洞方向至窗户方向进行,最后采用M7.5砌筑砂浆收边,竖向缝采用水泥:石灰:粉煤灰为1:2:3的混合料填充饱满后适量撒水使混合料下沉,再灌料补足,直至砖缝饱满,最后使用磨光机对页岩砖地坪面打磨清光。由于施工工艺简单、施工周期短、养护时间短、后期维护方便、备料方便、造价相对三合土地坪低,极大的方便了地坪铺设的施工。
Shale brick terrace construction process during koji-making fermentation
The invention discloses a shale brick terrace construction process during koji-making fermentation. The shale brick terrace construction process comprises the following steps that leveling is carried out by paving dry and hard cement mortar with the thickness of 20 mm and sand in a ratio of 1: 2, shale bricks are paved with the size of 240 * 115 * 53, and the shale bricks are vertically paved in a staggered joint manner in the long side direction; the laying sequence is carried out from the door opening direction of a fermentation room to the window direction, finally, M7.5 masonry mortar is adopted for edge closing, vertical joints are fully filled with a mixture of cement, lime and fly ash with the ratio of 1: 2: 3, then a proper amount of water is sprinkled to make the mixture sink, then the mixture is filled and supplemented till brick joints are full, and finally, a polishing machine is used for polishing and clearing the shale brick floor surface. The construction process is simple, the construction period is short, the maintenance time is short, later maintenance is convenient, material preparation is convenient, and the construction cost is lower than that of a concrete terrace, so that terrace laying construction is greatly facilitated.
本发明公开了一种制曲发酵间页岩砖地坪施工工艺,是由铺设20mm厚水泥:砂子为1:2的干硬性水泥砂浆找平,铺排页岩砖尺寸为240×115×53,按长边方向竖向错缝铺排;铺排顺序由发酵间门洞方向至窗户方向进行,最后采用M7.5砌筑砂浆收边,竖向缝采用水泥:石灰:粉煤灰为1:2:3的混合料填充饱满后适量撒水使混合料下沉,再灌料补足,直至砖缝饱满,最后使用磨光机对页岩砖地坪面打磨清光。由于施工工艺简单、施工周期短、养护时间短、后期维护方便、备料方便、造价相对三合土地坪低,极大的方便了地坪铺设的施工。
Shale brick terrace construction process during koji-making fermentation
一种制曲发酵间页岩砖地坪施工工艺
RUAN QIUBU (Autor:in) / HUANG BO (Autor:in) / MO CHANGLIU (Autor:in) / TANG TIAN (Autor:in) / LIANG JIAN (Autor:in) / WU SHUANGLIN (Autor:in)
24.12.2021
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
Firing process of solid shale brick and solid shale brick
Europäisches Patentamt | 2024
|Flow guide suspended ceiling structure of wine-making koji-making fermentation chamber
Europäisches Patentamt | 2023
|