Full-hidden construction method for inspection well
The invention provides a full-hidden construction method for an inspection well. The method comprises the following steps: arranging a well seat on a road surface rigid base layer, keeping the top surface of a well lid to be flush with the road surface rigid base layer, continuously paving an asphalt concrete surface layer on the road surface rigid base layer and the well lid, and performing sawing to form an inspection well lid and well base asphalt concrete after the pavement rigid base layer and the well lid are continuously paved, wherein a gap between the well base asphalt concrete and the asphalt concrete surface layer is filled with closed asphalt paste; continuous construction of the asphalt concrete surface layer is guaranteed, direct impact of vehicles on the inspection well can be eliminated, and it is smooth to drive and no noise is generated.
本发明提供了一种检查井全隐施工方法,包括以下步骤:井座设置于路面刚性基层上,保持井盖顶面与路面刚性基层平齐,沥青混凝土面层在路面刚性基层和井盖上连续摊铺,完成后锯切出检查井盖及井基沥青混凝土,井基沥青混凝土与沥青混凝土面层之间的间隙填充有闭缝沥青膏;保证沥青混凝土面层施工连续,同时可消除车辆对检查井的直接冲击,行车平顺,没有噪声。
Full-hidden construction method for inspection well
The invention provides a full-hidden construction method for an inspection well. The method comprises the following steps: arranging a well seat on a road surface rigid base layer, keeping the top surface of a well lid to be flush with the road surface rigid base layer, continuously paving an asphalt concrete surface layer on the road surface rigid base layer and the well lid, and performing sawing to form an inspection well lid and well base asphalt concrete after the pavement rigid base layer and the well lid are continuously paved, wherein a gap between the well base asphalt concrete and the asphalt concrete surface layer is filled with closed asphalt paste; continuous construction of the asphalt concrete surface layer is guaranteed, direct impact of vehicles on the inspection well can be eliminated, and it is smooth to drive and no noise is generated.
本发明提供了一种检查井全隐施工方法,包括以下步骤:井座设置于路面刚性基层上,保持井盖顶面与路面刚性基层平齐,沥青混凝土面层在路面刚性基层和井盖上连续摊铺,完成后锯切出检查井盖及井基沥青混凝土,井基沥青混凝土与沥青混凝土面层之间的间隙填充有闭缝沥青膏;保证沥青混凝土面层施工连续,同时可消除车辆对检查井的直接冲击,行车平顺,没有噪声。
Full-hidden construction method for inspection well
一种检查井全隐施工方法
LIU XUEQING (Autor:in) / ZHU CHENG (Autor:in) / LIU HENGRUI (Autor:in)
11.01.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Fully-hidden inspection well and construction method thereof
Europäisches Patentamt | 2022
|Inspection well construction technology and inspection well
Europäisches Patentamt | 2023
|