Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
A construction method of an annular water stop belt comprises the steps that a folding part is determined before the water stop belt is formed; a first hanging piece structure is installed on the folding part and located at the protruding part of the first folding part; the water stop belt is made to be annular, the water stop belt is folded to enable the section of the water stop belt to be M-shaped, and the basically-formed annular water stop belt is formed; a first hanging piece structure on the annular water stop belt is installed on the first rod body in a sliding mode; the first end of the first rod body is installed on the first connector section, and the second end of the first rod body is movably installed on the second connector section; and the first end of the annular water stop belt is arranged on the surface of the movable first connector section in a sleeving mode and connected with the movable first connector section in a sealed mode, and the second end of the annular water stop belt is connected with the second connector section in a sealed mode to form a water stop cavity.
本申请提供的环形止水带施工方法包括:止水带成型前确定折叠部;在折叠部上安装第一挂件结构,其位于第一折叠部的凸出部处;将止水带形成环形,折叠止水带使其截面呈M形,形成基本成型后的环形止水带;将环形止水带上的第一挂件结构可滑动地安装在第一杆体上;将第一杆体第一端安装在第一接头段上,第一杆体第二端可移动地安装在第二接头段上;将环形止水带第一端套设于可移动的第一接头段表面并与之密封连接,所述环形止水带第二端与第二接头段密封连接,以形成止水腔。
A construction method of an annular water stop belt comprises the steps that a folding part is determined before the water stop belt is formed; a first hanging piece structure is installed on the folding part and located at the protruding part of the first folding part; the water stop belt is made to be annular, the water stop belt is folded to enable the section of the water stop belt to be M-shaped, and the basically-formed annular water stop belt is formed; a first hanging piece structure on the annular water stop belt is installed on the first rod body in a sliding mode; the first end of the first rod body is installed on the first connector section, and the second end of the first rod body is movably installed on the second connector section; and the first end of the annular water stop belt is arranged on the surface of the movable first connector section in a sleeving mode and connected with the movable first connector section in a sealed mode, and the second end of the annular water stop belt is connected with the second connector section in a sealed mode to form a water stop cavity.
本申请提供的环形止水带施工方法包括:止水带成型前确定折叠部;在折叠部上安装第一挂件结构,其位于第一折叠部的凸出部处;将止水带形成环形,折叠止水带使其截面呈M形,形成基本成型后的环形止水带;将环形止水带上的第一挂件结构可滑动地安装在第一杆体上;将第一杆体第一端安装在第一接头段上,第一杆体第二端可移动地安装在第二接头段上;将环形止水带第一端套设于可移动的第一接头段表面并与之密封连接,所述环形止水带第二端与第二接头段密封连接,以形成止水腔。
Construction method of annular water stop belt
Patent
Elektronische Ressource
Europäisches Patentamt | 2023
|Water-stop belt material, water-stop belt and processing technology of water-stop belt material
Europäisches Patentamt | 2021
|