Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
High-flatness stainless steel ground construction technology
The invention aims to provide a high-flatness stainless steel floor construction process which is used for floors of acid-base workshops of factories such as lithium batteries. A high-flatness stainless steel ground construction technology comprises the following steps that S1, a ground paving area is evenly coated with interval strip-shaped neutral silicone adhesive; s2, bolt holes are pre-punched in the stainless steel plate at certain intervals; s3, paving a stainless steel plate; s4, drilling holes in the ground; s5, removing dust in the hole; s6, chemical stainless steel bolts are implanted into the holes; s7, manual low-temperature welding or manual argon arc welding is conducted; s8, splicing seams between the plates and bolt hole gaps are welded; s9, after welding is completed, the bolts are cut flat, and weld joints are ground and polished; the method has the beneficial effects that the welding heated deformation and bulging resistance of the stainless steel plate floor is improved, and the strength and the appearance flatness of the stainless steel floor are improved.
本发明的目的在于提供一种高平整度不锈钢地面施工工艺,用于锂电池等工厂酸碱车间的地面;一种高平整度不锈钢地面施工工艺,包括以下步骤:S1:在地面铺装区域均匀涂覆间隔带状中性硅酮胶;S2:不锈钢板按一定间隔预冲孔螺栓孔;S3:铺装不锈钢板;S4:地面钻孔;S5:孔内清灰;S6:在孔内植入化学不锈钢螺栓;S7:手工低温焊或手工氩弧焊;S8:焊接板间拼缝及螺栓孔缝隙;S9:焊接完成后切平螺栓,焊缝打磨抛光;本发明的有益效果为:提高不锈钢板地板抗焊接受热形变起鼓,提高不锈钢地板强度以及外观平整度。
High-flatness stainless steel ground construction technology
The invention aims to provide a high-flatness stainless steel floor construction process which is used for floors of acid-base workshops of factories such as lithium batteries. A high-flatness stainless steel ground construction technology comprises the following steps that S1, a ground paving area is evenly coated with interval strip-shaped neutral silicone adhesive; s2, bolt holes are pre-punched in the stainless steel plate at certain intervals; s3, paving a stainless steel plate; s4, drilling holes in the ground; s5, removing dust in the hole; s6, chemical stainless steel bolts are implanted into the holes; s7, manual low-temperature welding or manual argon arc welding is conducted; s8, splicing seams between the plates and bolt hole gaps are welded; s9, after welding is completed, the bolts are cut flat, and weld joints are ground and polished; the method has the beneficial effects that the welding heated deformation and bulging resistance of the stainless steel plate floor is improved, and the strength and the appearance flatness of the stainless steel floor are improved.
本发明的目的在于提供一种高平整度不锈钢地面施工工艺,用于锂电池等工厂酸碱车间的地面;一种高平整度不锈钢地面施工工艺,包括以下步骤:S1:在地面铺装区域均匀涂覆间隔带状中性硅酮胶;S2:不锈钢板按一定间隔预冲孔螺栓孔;S3:铺装不锈钢板;S4:地面钻孔;S5:孔内清灰;S6:在孔内植入化学不锈钢螺栓;S7:手工低温焊或手工氩弧焊;S8:焊接板间拼缝及螺栓孔缝隙;S9:焊接完成后切平螺栓,焊缝打磨抛光;本发明的有益效果为:提高不锈钢板地板抗焊接受热形变起鼓,提高不锈钢地板强度以及外观平整度。
High-flatness stainless steel ground construction technology
一种高平整度不锈钢地面施工工艺
XUE JIANHUAI (Autor:in) / MENG FANHAO (Autor:in) / DAI MAOFU (Autor:in) / XI XIAOJIE (Autor:in) / LI XIN (Autor:in)
01.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
High-flatness stainless steel ground construction technology
Europäisches Patentamt | 2023
|Concrete ground flatness detection device for building construction
Europäisches Patentamt | 2021
|Ground flatness detection device for municipal road construction
Europäisches Patentamt | 2022
|