Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Grouting device for post-grouting of PHC tubular pile and post-grouting process
The invention provides a grouting device for post-grouting of a PHC pipe pile and a post-grouting process, and relates to the technical field of building construction. A grouting device for post-grouting of a PHC pipe pile comprises a pipe body and a grouting plug, a guniting hole is formed in the side wall of the pipe body, a top plate and a bottom plate are arranged at the two ends of the pipe body respectively, and a grouting hole communicated with the pipe body is formed in the top plate; a grouting pipe used for grouting is arranged in the grouting plug in a penetrating mode, the grouting pipe is matched with the grouting hole, the grouting device is used for carrying out the post-grouting construction technology, the bearing capacity of a pipe pile can be effectively improved, the engineering quality is ensured, construction is convenient and fast, and the construction efficiency can be improved. The post-grouting process comprises a tubular pile mounting step and a pile sinking grouting step. The post-grouting process is simple in process flow and convenient and fast to construct, and the constructed tubular pile is high in bearing capacity and good in application effect.
本发明提供一种用于PHC管桩后注浆的注浆器及后注浆工艺,涉及建筑施工技术领域。一种用于PHC管桩后注浆的注浆器,其包括管体和注浆塞,上述管体侧壁设置有喷浆孔,上述管体的两端分别设置有顶板和底板,上述顶板设置有与上述管体相连通的注浆孔;上述注浆塞内穿设有用于注浆的注浆管,上述注浆管与上述注浆孔相配合,通过使用该注浆器开展后注浆施工工艺,能够有效提高管桩承载力,确保工程质量,施工起来方便快捷,有助于提高施工效率。该后注浆工艺步骤包括管桩安装步骤和沉桩注浆步骤,该工艺流程简单,施工起来方便快捷,施工后的管桩承载力高,应用效果好。
Grouting device for post-grouting of PHC tubular pile and post-grouting process
The invention provides a grouting device for post-grouting of a PHC pipe pile and a post-grouting process, and relates to the technical field of building construction. A grouting device for post-grouting of a PHC pipe pile comprises a pipe body and a grouting plug, a guniting hole is formed in the side wall of the pipe body, a top plate and a bottom plate are arranged at the two ends of the pipe body respectively, and a grouting hole communicated with the pipe body is formed in the top plate; a grouting pipe used for grouting is arranged in the grouting plug in a penetrating mode, the grouting pipe is matched with the grouting hole, the grouting device is used for carrying out the post-grouting construction technology, the bearing capacity of a pipe pile can be effectively improved, the engineering quality is ensured, construction is convenient and fast, and the construction efficiency can be improved. The post-grouting process comprises a tubular pile mounting step and a pile sinking grouting step. The post-grouting process is simple in process flow and convenient and fast to construct, and the constructed tubular pile is high in bearing capacity and good in application effect.
本发明提供一种用于PHC管桩后注浆的注浆器及后注浆工艺,涉及建筑施工技术领域。一种用于PHC管桩后注浆的注浆器,其包括管体和注浆塞,上述管体侧壁设置有喷浆孔,上述管体的两端分别设置有顶板和底板,上述顶板设置有与上述管体相连通的注浆孔;上述注浆塞内穿设有用于注浆的注浆管,上述注浆管与上述注浆孔相配合,通过使用该注浆器开展后注浆施工工艺,能够有效提高管桩承载力,确保工程质量,施工起来方便快捷,有助于提高施工效率。该后注浆工艺步骤包括管桩安装步骤和沉桩注浆步骤,该工艺流程简单,施工起来方便快捷,施工后的管桩承载力高,应用效果好。
Grouting device for post-grouting of PHC tubular pile and post-grouting process
一种用于PHC管桩后注浆的注浆器及后注浆工艺
WANG WEIZE (Autor:in)
04.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2023
|Post-grouting device and post-grouting method for PHC tubular pile
Europäisches Patentamt | 2024
|Post-grouting grouting device for bored pile and grouting method
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2015
|