Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Occlusive pile construction method
The invention provides a secant pile construction method which comprises the following steps that a sleeve is put at a preset position, the sleeve is driven to be pressed downwards, and sundries in the sleeve are removed; and when the sleeve is pressed down and encounters an obstacle, obstacle removing treatment is performed on a pipe opening in the lower end of the sleeve. According to the technical scheme, the construction quality of the secant pile is improved.
本发明提出一种咬合桩施工方法,包括如下步骤:在预设位置施放套管,驱使所述套管下压,并清除所述套管内的杂物;当所述套管下压遇到障碍物时,对所述套管下端管口处进行清障处理。本申请的技术方案,提高了咬合桩的施工质量。
Occlusive pile construction method
The invention provides a secant pile construction method which comprises the following steps that a sleeve is put at a preset position, the sleeve is driven to be pressed downwards, and sundries in the sleeve are removed; and when the sleeve is pressed down and encounters an obstacle, obstacle removing treatment is performed on a pipe opening in the lower end of the sleeve. According to the technical scheme, the construction quality of the secant pile is improved.
本发明提出一种咬合桩施工方法,包括如下步骤:在预设位置施放套管,驱使所述套管下压,并清除所述套管内的杂物;当所述套管下压遇到障碍物时,对所述套管下端管口处进行清障处理。本申请的技术方案,提高了咬合桩的施工质量。
Occlusive pile construction method
咬合桩施工方法
LIU SHUANG (Autor:in) / LIU DEBING (Autor:in) / ZHAO HONGXI (Autor:in) / LI WEILAI (Autor:in) / DUAN FENG (Autor:in) / XUE XIAOHONG (Autor:in) / JIANG ZIQI (Autor:in) / SUN JING (Autor:in) / HAO LONGFEI (Autor:in) / MIAO SHUAI (Autor:in)
15.03.2022
Patent
Elektronische Ressource
Chinesisch
Occlusive pile construction method and prefabricated occlusive piles used for method
Europäisches Patentamt | 2015
|Construction method of deep rock drilling occlusive pile of segmented construction
Europäisches Patentamt | 2020
|Urban complex underground obstacle working condition occlusive pile enclosure construction method
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2015
|