Construction method for shortening construction period of roof engineering in rainy season
The invention relates to the field of building construction, in particular to a construction method for shortening the construction period of roof engineering in rainy seasons. 2, a foam concrete slope making layer is constructed; step 3, DS mortar leveling layer construction; step 4, constructing a waterproof layer; step 5, constructing a thermal insulation layer; step 6, constructing a fine aggregate concrete protective layer; 7, joint cutting and joint filling are conducted; and step 8, maintaining. The waterproof heat insulation layer formed by combining the flexible coiled material with good waterproof performance and the light heat insulation foam concrete is adopted, the structure is simple, and the good waterproof effect and heat insulation performance are achieved. Compared with a traditional roof manufacturing method, the slope making layer is made of foam concrete, the construction period is shorter, a certain proportion of admixture is added during foam concrete construction, the setting and hardening time of the foam concrete is shortened, and therefore the construction period of the roof manufacturing method is further shortened. The influence of the rainy season on the project progress and quality can be greatly reduced.
本发明涉及建筑施工领域,具体是一种缩短雨季屋面工程施工工期的施工方法,包括步骤1、基层清理;步骤2、泡沫混凝土找坡层施工;步骤3、DS砂浆找平层施工;步骤4、防水层施工;步骤5、保温层施工;步骤6、细石混凝土保护层施工;步骤7、切缝填缝;步骤8、养护。本发明采用防水性能好的柔性卷材和轻质隔热泡沫混凝土结合组成的防水隔热层,结构简单,具有良好的防水作用和隔热保温性能。找坡层材料使用泡沫混凝土相比与传统屋面做法工期更短,在泡沫混凝土施工时添加一定比例的外加剂缩短泡沫混凝土的凝结硬化时间,从而进一步缩短本发明屋面做法的施工工期。本发明可以大大降低雨季对工程进度和质量的影响。
Construction method for shortening construction period of roof engineering in rainy season
The invention relates to the field of building construction, in particular to a construction method for shortening the construction period of roof engineering in rainy seasons. 2, a foam concrete slope making layer is constructed; step 3, DS mortar leveling layer construction; step 4, constructing a waterproof layer; step 5, constructing a thermal insulation layer; step 6, constructing a fine aggregate concrete protective layer; 7, joint cutting and joint filling are conducted; and step 8, maintaining. The waterproof heat insulation layer formed by combining the flexible coiled material with good waterproof performance and the light heat insulation foam concrete is adopted, the structure is simple, and the good waterproof effect and heat insulation performance are achieved. Compared with a traditional roof manufacturing method, the slope making layer is made of foam concrete, the construction period is shorter, a certain proportion of admixture is added during foam concrete construction, the setting and hardening time of the foam concrete is shortened, and therefore the construction period of the roof manufacturing method is further shortened. The influence of the rainy season on the project progress and quality can be greatly reduced.
本发明涉及建筑施工领域,具体是一种缩短雨季屋面工程施工工期的施工方法,包括步骤1、基层清理;步骤2、泡沫混凝土找坡层施工;步骤3、DS砂浆找平层施工;步骤4、防水层施工;步骤5、保温层施工;步骤6、细石混凝土保护层施工;步骤7、切缝填缝;步骤8、养护。本发明采用防水性能好的柔性卷材和轻质隔热泡沫混凝土结合组成的防水隔热层,结构简单,具有良好的防水作用和隔热保温性能。找坡层材料使用泡沫混凝土相比与传统屋面做法工期更短,在泡沫混凝土施工时添加一定比例的外加剂缩短泡沫混凝土的凝结硬化时间,从而进一步缩短本发明屋面做法的施工工期。本发明可以大大降低雨季对工程进度和质量的影响。
Construction method for shortening construction period of roof engineering in rainy season
一种缩短雨季屋面工程施工工期的施工方法
ZHOU LIJUN (Autor:in) / ZHANG MENGRAN (Autor:in) / LI WEIDONG (Autor:in) / YANG WANHAO (Autor:in)
18.03.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E04D
ROOF COVERINGS
,
Dacheindeckungen
Arch bridge construction beats rainy season
Engineering Index Backfile | 1952
Earthwork construction method suitable for rainy season
Europäisches Patentamt | 2022
|Rainy season roadbed earthwork construction structure and construction method thereof
Europäisches Patentamt | 2020
|Auxiliary equipment for prestressed pipe pile construction in rainy season
Europäisches Patentamt | 2023
|