Sectional assembling and integral sliding construction method for rainwater square culvert engineering formworks
The invention relates to the technical field of civil engineering, in particular to a segmented assembling and integral sliding construction method for a rainwater square culvert engineering formwork. The construction method comprises the construction steps of formwork installation construction, formwork demolding and transportation construction and formwork transportation. According to the outer formwork part, four pulleys below an upper transverse rod jack up outer formworks on the two sides to move forwards. The inner formwork slides, and the whole inner formwork is lifted firstly through the sliding trolley (9) and then slides. The method has the advantages that labor is saved, the formwork turnover rate is increased, the construction cost is reduced, and the construction quality and safe operation are guaranteed.
一种雨水方涵工程模板分段拼装整体滑移施工方法,涉及土木工程技术领域。施工步骤包括:模板安装施工,模板脱模及运输施工,模板运输,外模部分是由上部横杆下的四个滑轮顶起两侧外模向前行走;内模板滑移通过滑移台车(9)将整体内模先提升,再滑动。优点在于,节约劳动力、提高模板周转率,降低施工成本,保证施工的质量和安全操作。
Sectional assembling and integral sliding construction method for rainwater square culvert engineering formworks
The invention relates to the technical field of civil engineering, in particular to a segmented assembling and integral sliding construction method for a rainwater square culvert engineering formwork. The construction method comprises the construction steps of formwork installation construction, formwork demolding and transportation construction and formwork transportation. According to the outer formwork part, four pulleys below an upper transverse rod jack up outer formworks on the two sides to move forwards. The inner formwork slides, and the whole inner formwork is lifted firstly through the sliding trolley (9) and then slides. The method has the advantages that labor is saved, the formwork turnover rate is increased, the construction cost is reduced, and the construction quality and safe operation are guaranteed.
一种雨水方涵工程模板分段拼装整体滑移施工方法,涉及土木工程技术领域。施工步骤包括:模板安装施工,模板脱模及运输施工,模板运输,外模部分是由上部横杆下的四个滑轮顶起两侧外模向前行走;内模板滑移通过滑移台车(9)将整体内模先提升,再滑动。优点在于,节约劳动力、提高模板周转率,降低施工成本,保证施工的质量和安全操作。
Sectional assembling and integral sliding construction method for rainwater square culvert engineering formworks
一种雨水方涵工程模板分段拼装整体滑移施工方法
WANG JIE (Autor:in) / CHENG TIEMENG (Autor:in) / ZHAO XINGYU (Autor:in)
13.05.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Expansion construction method for urban rainwater box culvert