Construction method of water conservancy project waste slag field
The invention discloses a construction method of a water conservancy project waste slag yard, which comprises the following steps: firstly, excavating waste stones to build a lower slag retaining dam, and spouting soil in the waste slag yard; and in the later period, waste stone is excavated to heighten the slag retaining dam, and spoil is not adopted to build a side slope outside the waste slag yard. Heightening of the slag retaining dam is gradually implemented along with excavation of the waste stones, and soil can be spoiled to the inner area of the waste slag field while the slag retaining dam is heightened. When the slag retaining dam is heightened, the width and height of the dam body should be extended towards the downstream of the slag retaining dam. After the waste residues are stacked, crops are planted on the surface of the waste soil area in the waste residue field. The outer side slope of the waste slag field is the waste stones, the side slope stability of the waste slag field is improved, meanwhile, the occupied area of the waste slag field can be effectively reduced, the soil loss amount of the waste slag field in the construction period is reduced, and the land utilization rate is increased.
本发明公开了一种水利工程弃渣场的施工方法,首先采用开挖废弃石料修建较低的拦渣坝,在弃渣场内部区域弃土。后期采用开挖废弃石料加高拦渣坝,不采用弃土堆筑弃渣场外边坡。拦渣坝的加高随着开挖废弃石料逐渐实施,可实现边加高拦渣坝,边向弃渣场内部区域弃土。加高拦渣坝时应向拦渣坝下游延伸坝体宽度和高度。弃渣堆置完毕后,在弃渣场内部弃土区域表面种植农作物。本发明弃渣场外边坡为弃石,增加了弃渣场的边坡稳定性,同时能够有效减少弃渣场的占地面积,减少施工期弃渣场土壤流失量,提高土地利用率。
Construction method of water conservancy project waste slag field
The invention discloses a construction method of a water conservancy project waste slag yard, which comprises the following steps: firstly, excavating waste stones to build a lower slag retaining dam, and spouting soil in the waste slag yard; and in the later period, waste stone is excavated to heighten the slag retaining dam, and spoil is not adopted to build a side slope outside the waste slag yard. Heightening of the slag retaining dam is gradually implemented along with excavation of the waste stones, and soil can be spoiled to the inner area of the waste slag field while the slag retaining dam is heightened. When the slag retaining dam is heightened, the width and height of the dam body should be extended towards the downstream of the slag retaining dam. After the waste residues are stacked, crops are planted on the surface of the waste soil area in the waste residue field. The outer side slope of the waste slag field is the waste stones, the side slope stability of the waste slag field is improved, meanwhile, the occupied area of the waste slag field can be effectively reduced, the soil loss amount of the waste slag field in the construction period is reduced, and the land utilization rate is increased.
本发明公开了一种水利工程弃渣场的施工方法,首先采用开挖废弃石料修建较低的拦渣坝,在弃渣场内部区域弃土。后期采用开挖废弃石料加高拦渣坝,不采用弃土堆筑弃渣场外边坡。拦渣坝的加高随着开挖废弃石料逐渐实施,可实现边加高拦渣坝,边向弃渣场内部区域弃土。加高拦渣坝时应向拦渣坝下游延伸坝体宽度和高度。弃渣堆置完毕后,在弃渣场内部弃土区域表面种植农作物。本发明弃渣场外边坡为弃石,增加了弃渣场的边坡稳定性,同时能够有效减少弃渣场的占地面积,减少施工期弃渣场土壤流失量,提高土地利用率。
Construction method of water conservancy project waste slag field
一种水利工程弃渣场的施工方法
LI RUIHONG (Autor:in) / MENG FANBIN (Autor:in) / YE MAOSHENG (Autor:in) / LI YUEQIANG (Autor:in) / MA SHILONG (Autor:in) / WANG TONG (Autor:in) / LI PENGLU (Autor:in) / BAO BIAO (Autor:in) / HUANG CHAO (Autor:in) / LI KEZHONG (Autor:in)
13.05.2022
Patent
Elektronische Ressource
Chinesisch
Automatic slag removal water conservancy pipeline applied to water conservancy project
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2020
|Automatic pipeline slag removing device for water conservancy project
Europäisches Patentamt | 2020
|Water conservancy project waterproof roll construction method
Europäisches Patentamt | 2023
|