Method for excavating and breaking middle part of defective cast-in-place pile
The invention relates to the technical field of building construction, and discloses a method for excavating and breaking the middle of a defective cast-in-place pile. Comprising the following construction steps that S1, a drilling positioning machine is moved to the position above the defective cast-in-place pile, and the drilling positioning machine is fixed; s2, a positioning mechanism is started, and the drilling position is determined according to the diameter of the defective cast-in-place pile; s3, a drilling mechanism is started, water mill drilling is conducted, and a through annular space is formed through communication; s4, a detection core-pulling hole is reserved in a concrete column in the middle of the defective cast-in-place pile, and a plurality of drill holes are additionally formed through a pneumatic hammer machine; s5, a hammer head and a steel wedge are arranged in the outer ring water mill drill hole, so that the concrete column is separated from the concrete body of the pile body; s6, the block concrete is hoisted out of the hole through a winch and a hoisting hopper; s7, after concrete of the pile body of the defective pile on the top layer is chiseled away, construction of the next layer is conducted; and S8, repeating the step of breaking the middle concrete column after the water milling and drilling occlusion annular coring until the defect position is excavated.
本发明涉及建筑施工技术领域,公开了缺陷灌注桩中部开挖破除方法。包括以下施工步骤:S1:将钻孔定位机移动至缺陷灌注桩的上方,固定钻孔定位机;S2:启动定位机构,按照缺陷灌注桩的直径确定钻孔位置;S3:启动钻孔机构,水磨钻孔并连通为贯通的环形空间;S4:缺陷灌注桩中部的混凝土柱上留有检测抽芯孔,再利用风炮机增加若干个钻孔;S5:在外环水磨钻孔内置入锤头与钢楔子,使混凝土柱从桩身混凝土本体中脱离;S6:利用卷扬机和吊斗将分块混凝土起吊出孔;S7:完成顶层缺陷桩桩身混凝土凿除后,进行下一层施工;S8:重复上述先水磨钻咬合环状取芯后破除中部混凝土柱的步骤,直至开挖至缺陷位置。
Method for excavating and breaking middle part of defective cast-in-place pile
The invention relates to the technical field of building construction, and discloses a method for excavating and breaking the middle of a defective cast-in-place pile. Comprising the following construction steps that S1, a drilling positioning machine is moved to the position above the defective cast-in-place pile, and the drilling positioning machine is fixed; s2, a positioning mechanism is started, and the drilling position is determined according to the diameter of the defective cast-in-place pile; s3, a drilling mechanism is started, water mill drilling is conducted, and a through annular space is formed through communication; s4, a detection core-pulling hole is reserved in a concrete column in the middle of the defective cast-in-place pile, and a plurality of drill holes are additionally formed through a pneumatic hammer machine; s5, a hammer head and a steel wedge are arranged in the outer ring water mill drill hole, so that the concrete column is separated from the concrete body of the pile body; s6, the block concrete is hoisted out of the hole through a winch and a hoisting hopper; s7, after concrete of the pile body of the defective pile on the top layer is chiseled away, construction of the next layer is conducted; and S8, repeating the step of breaking the middle concrete column after the water milling and drilling occlusion annular coring until the defect position is excavated.
本发明涉及建筑施工技术领域,公开了缺陷灌注桩中部开挖破除方法。包括以下施工步骤:S1:将钻孔定位机移动至缺陷灌注桩的上方,固定钻孔定位机;S2:启动定位机构,按照缺陷灌注桩的直径确定钻孔位置;S3:启动钻孔机构,水磨钻孔并连通为贯通的环形空间;S4:缺陷灌注桩中部的混凝土柱上留有检测抽芯孔,再利用风炮机增加若干个钻孔;S5:在外环水磨钻孔内置入锤头与钢楔子,使混凝土柱从桩身混凝土本体中脱离;S6:利用卷扬机和吊斗将分块混凝土起吊出孔;S7:完成顶层缺陷桩桩身混凝土凿除后,进行下一层施工;S8:重复上述先水磨钻咬合环状取芯后破除中部混凝土柱的步骤,直至开挖至缺陷位置。
Method for excavating and breaking middle part of defective cast-in-place pile
缺陷灌注桩中部开挖破除方法
CHEN ZHENGJIE (Autor:in)
31.05.2022
Patent
Elektronische Ressource
Chinesisch
Construction method of rotary excavating cast-in-place pile
Europäisches Patentamt | 2023
|Underwater rotary excavating cast-in-place pile construction method
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Rotary excavating cast-in-place pile drilling positioning device
Europäisches Patentamt | 2021
|Rotary-excavating cast-in-place pile full-casing construction method
Europäisches Patentamt | 2021
|