Underwater rotary excavating cast-in-place pile construction method
The invention discloses an underwater rotary excavating cast-in-place pile construction method which comprises the following steps: step 1, carrying out site arrangement, then carrying out drawing review, meanwhile, carrying out fixed-point axis checking, and then completing pile position lofting; secondly, a drilling machine is placed in place, and a drill bit of the drilling machine is manufactured; step 3, performing primary hole cleaning, and measuring the hole depth, the hole diameter and the gradient after hole cleaning is completed; fourthly, a reinforcement cage is manufactured, and the manufactured reinforcement cage is subjected to hanging welding, positioning and acceptance inspection; sixthly, after the guide pipe is installed, the slurry performance and sediment at the bottom of the hole are detected, and secondary hole cleaning is conducted after detection is completed; and 7, a waterproof plug is arranged, concrete is stirred, a concrete test block is manufactured, meanwhile, the elevation of the top face of the concrete is measured, then underwater concrete pouring is conducted to form a pile, then a pile casing is lifted, and a drilling machine is moved to complete pile construction. According to the construction method of the underwater rotary excavating cast-in-place pile, through the arrangement of the steps, pile position lofting is carried out before hole forming, and therefore the accuracy of the drilling position is well guaranteed.
本发明公开了一种水下旋挖灌注桩施工方法,包括如下步骤:步骤一,进行场地布置,然后进行图纸会审,同时进行定点轴线校核,之后完成桩位放样;步骤二,将钻机就位,制作钻机的钻头;步骤三,进行一次清孔,清孔完成后测量孔深、孔径以及倾斜度;步骤四,制作钢筋笼,将制作完成的钢筋笼吊焊并且定位验收;步骤六,在导管安装完成后,检测泥浆性能和孔底沉渣,并在检测完成后进行二次清孔;步骤七,设置隔水塞,搅拌混凝土,制作砼试块,同时测量砼顶面标高,后进行水下灌注砼成桩,之后提拔护筒,迁移钻机完成桩施工。本发明的水下旋挖灌注桩施工方法,通过上述步骤的设置,在成孔之前进行了桩位放样,如此很好的保证了钻孔位置的精确度。
Underwater rotary excavating cast-in-place pile construction method
The invention discloses an underwater rotary excavating cast-in-place pile construction method which comprises the following steps: step 1, carrying out site arrangement, then carrying out drawing review, meanwhile, carrying out fixed-point axis checking, and then completing pile position lofting; secondly, a drilling machine is placed in place, and a drill bit of the drilling machine is manufactured; step 3, performing primary hole cleaning, and measuring the hole depth, the hole diameter and the gradient after hole cleaning is completed; fourthly, a reinforcement cage is manufactured, and the manufactured reinforcement cage is subjected to hanging welding, positioning and acceptance inspection; sixthly, after the guide pipe is installed, the slurry performance and sediment at the bottom of the hole are detected, and secondary hole cleaning is conducted after detection is completed; and 7, a waterproof plug is arranged, concrete is stirred, a concrete test block is manufactured, meanwhile, the elevation of the top face of the concrete is measured, then underwater concrete pouring is conducted to form a pile, then a pile casing is lifted, and a drilling machine is moved to complete pile construction. According to the construction method of the underwater rotary excavating cast-in-place pile, through the arrangement of the steps, pile position lofting is carried out before hole forming, and therefore the accuracy of the drilling position is well guaranteed.
本发明公开了一种水下旋挖灌注桩施工方法,包括如下步骤:步骤一,进行场地布置,然后进行图纸会审,同时进行定点轴线校核,之后完成桩位放样;步骤二,将钻机就位,制作钻机的钻头;步骤三,进行一次清孔,清孔完成后测量孔深、孔径以及倾斜度;步骤四,制作钢筋笼,将制作完成的钢筋笼吊焊并且定位验收;步骤六,在导管安装完成后,检测泥浆性能和孔底沉渣,并在检测完成后进行二次清孔;步骤七,设置隔水塞,搅拌混凝土,制作砼试块,同时测量砼顶面标高,后进行水下灌注砼成桩,之后提拔护筒,迁移钻机完成桩施工。本发明的水下旋挖灌注桩施工方法,通过上述步骤的设置,在成孔之前进行了桩位放样,如此很好的保证了钻孔位置的精确度。
Underwater rotary excavating cast-in-place pile construction method
水下旋挖灌注桩施工方法
YANG PENG (Autor:in) / PENG HUA (Autor:in) / CHEN ZHICHENG (Autor:in) / DIAO JINXIANG (Autor:in) / OH JI-WOONG (Autor:in) / WU LIERUN (Autor:in) / CHEN WEILIE (Autor:in) / XIAO JINMING (Autor:in)
10.11.2023
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Construction method of rotary excavating cast-in-place pile
Europäisches Patentamt | 2023
|Rotary-excavating cast-in-place pile full-casing construction method
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2023
|Rotary excavating cast-in-place pile construction technology and system
Europäisches Patentamt | 2022
|Grading hole-forming construction method for rotary excavating cast-in-place pile
Europäisches Patentamt | 2021
|