Deep foundation pit dismounting and replacing support construction method for building construction
The invention relates to a deep foundation pit dismounting and replacing support construction method for building construction, and belongs to the technical field of basement construction. According to the construction method, an inner support is not disassembled in the main body construction stage, main body wall and column steel bars are drilled to penetrate through an inner supporting beam, a support changing system formed by combining a support changing beam and a force transmission plate strip is additionally arranged, main body structure construction is conducted firstly, after the main body is constructed to +/-0.000m, the support is disassembled, and cutting is conducted through a rope saw for support disassembling; by means of the construction method, the safety of the foundation pit in the construction main body stage is powerfully guaranteed, the construction progress is accelerated, machines, manpower, materials and the like are saved, and the safety of the surrounding environment is guaranteed.
本发明涉及一种建筑物施工用深基坑拆换撑施工方法,属于地下室施工技术领域。通过采用内支撑在主体施工阶段不拆撑,让主体墙、柱钢筋打眼穿过内支撑梁,并增加换撑梁、传力板带组合的换撑体系,先进行主体结构施工,待主体施工至±0.000m后,再进行拆撑的施工方法,拆撑采用绳锯切割;采用此工法有力保证了施工主体阶段基坑的安全性,加快了施工进度,节约了机械、人工、材料等,确保了周边环境的安全。
Deep foundation pit dismounting and replacing support construction method for building construction
The invention relates to a deep foundation pit dismounting and replacing support construction method for building construction, and belongs to the technical field of basement construction. According to the construction method, an inner support is not disassembled in the main body construction stage, main body wall and column steel bars are drilled to penetrate through an inner supporting beam, a support changing system formed by combining a support changing beam and a force transmission plate strip is additionally arranged, main body structure construction is conducted firstly, after the main body is constructed to +/-0.000m, the support is disassembled, and cutting is conducted through a rope saw for support disassembling; by means of the construction method, the safety of the foundation pit in the construction main body stage is powerfully guaranteed, the construction progress is accelerated, machines, manpower, materials and the like are saved, and the safety of the surrounding environment is guaranteed.
本发明涉及一种建筑物施工用深基坑拆换撑施工方法,属于地下室施工技术领域。通过采用内支撑在主体施工阶段不拆撑,让主体墙、柱钢筋打眼穿过内支撑梁,并增加换撑梁、传力板带组合的换撑体系,先进行主体结构施工,待主体施工至±0.000m后,再进行拆撑的施工方法,拆撑采用绳锯切割;采用此工法有力保证了施工主体阶段基坑的安全性,加快了施工进度,节约了机械、人工、材料等,确保了周边环境的安全。
Deep foundation pit dismounting and replacing support construction method for building construction
一种建筑物施工用深基坑拆换撑施工方法
GONG BOBIN (Autor:in) / HAN XUELI (Autor:in) / LIU LIQIANG (Autor:in) / PAN CHENRONG (Autor:in) / LUO HAIYAN (Autor:in) / WANG YULONG (Autor:in) / LIU WEI (Autor:in) / GUO WEIGANG (Autor:in) / WANG JIANGPENG (Autor:in) / WANG LEI (Autor:in)
01.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Support dismounting and replacing construction process for foundation pit construction
Europäisches Patentamt | 2024
|Construction method for dismounting and replacing support of ultra-deep foundation pit in sandy soil
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|Structural column dismounting and replacing construction method
Europäisches Patentamt | 2023
|Intelligent garage and automobile ramp dismounting and replacing support construction method
Europäisches Patentamt | 2024
|