Intelligent garage and automobile ramp dismounting and replacing support construction method
The invention relates to the technical field of building construction, in particular to an intelligent garage and an automobile ramp dismounting and replacing support construction method. The method comprises the following steps: S1, preparation work before installation; s2, main body structure construction and embedded part embedding of the intelligent garage and the automobile ramp are carried out; s3, a limiting lug plate is additionally welded to the square steel pipe and used for temporarily fixing the square steel pipe; s4, square steel pipe hoisting, mounting and welding, and steel plate hoisting and laying; s5, replacing a supporting plate and backfilling a fertilizer groove; s6, paying off at the cutting position; s7, reinforcing a floor slab structure; s8, placing inner support stirrups; and S9, the inner supports are cut, hoisted and transported outwards, and the square steel pipe is turned over to be used for dismantling the next inner support after each inner support is dismantled. In the joining process of intelligent garage and ramp body construction and foundation pit support inner support dismantling, foundation pit soil pressure and hole safety protection are reasonably converted, and the problems that the site space is narrow, all subareas of a foundation pit are subjected to unbalanced construction, and the construction period is short are solved.
本发明涉及建筑施工技术领域,尤其是涉及一种智能车库及汽车坡道拆换撑施工方法。所述方法,包括:S1、安装前准备工作;S2、智能车库及汽车坡道的主体结构施工及预埋件预埋;S3、方钢管加焊限位耳板,用于方钢管临时固定;S4、方钢管吊运安装焊接及钢板吊装铺设;S5、换撑板及肥槽回填;S6、切割位置放线;S7、楼板结构加固;S8、内支撑马镫放置;S9、内支撑切割及吊装外运,其中,所述方钢管在每一道内支撑拆除后周转用于下一道内支撑拆除。本发明在智能车库及坡道主体施工与基坑支护内支撑拆除的衔接过程中,合理转换基坑土压力及孔洞安全防护,有助于解决场地空间狭小、基坑各分区不均衡施工且工期紧张的问题。
Intelligent garage and automobile ramp dismounting and replacing support construction method
The invention relates to the technical field of building construction, in particular to an intelligent garage and an automobile ramp dismounting and replacing support construction method. The method comprises the following steps: S1, preparation work before installation; s2, main body structure construction and embedded part embedding of the intelligent garage and the automobile ramp are carried out; s3, a limiting lug plate is additionally welded to the square steel pipe and used for temporarily fixing the square steel pipe; s4, square steel pipe hoisting, mounting and welding, and steel plate hoisting and laying; s5, replacing a supporting plate and backfilling a fertilizer groove; s6, paying off at the cutting position; s7, reinforcing a floor slab structure; s8, placing inner support stirrups; and S9, the inner supports are cut, hoisted and transported outwards, and the square steel pipe is turned over to be used for dismantling the next inner support after each inner support is dismantled. In the joining process of intelligent garage and ramp body construction and foundation pit support inner support dismantling, foundation pit soil pressure and hole safety protection are reasonably converted, and the problems that the site space is narrow, all subareas of a foundation pit are subjected to unbalanced construction, and the construction period is short are solved.
本发明涉及建筑施工技术领域,尤其是涉及一种智能车库及汽车坡道拆换撑施工方法。所述方法,包括:S1、安装前准备工作;S2、智能车库及汽车坡道的主体结构施工及预埋件预埋;S3、方钢管加焊限位耳板,用于方钢管临时固定;S4、方钢管吊运安装焊接及钢板吊装铺设;S5、换撑板及肥槽回填;S6、切割位置放线;S7、楼板结构加固;S8、内支撑马镫放置;S9、内支撑切割及吊装外运,其中,所述方钢管在每一道内支撑拆除后周转用于下一道内支撑拆除。本发明在智能车库及坡道主体施工与基坑支护内支撑拆除的衔接过程中,合理转换基坑土压力及孔洞安全防护,有助于解决场地空间狭小、基坑各分区不均衡施工且工期紧张的问题。
Intelligent garage and automobile ramp dismounting and replacing support construction method
一种智能车库及汽车坡道拆换撑施工方法
LIN ERXING (Autor:in) / LU YAJUN (Autor:in) / LI HONG (Autor:in) / ZHANG SHANZHUANG (Autor:in)
23.01.2024
Patent
Elektronische Ressource
Chinesisch
Support dismounting and replacing construction process for foundation pit construction
Europäisches Patentamt | 2024
|Structural column dismounting and replacing construction method
Europäisches Patentamt | 2023
|Deep foundation pit dismounting and replacing support construction method for building construction
Europäisches Patentamt | 2022
|Engineering Index Backfile | 1923
Underground garage waterproof ramp and construction method thereof
Europäisches Patentamt | 2024
|