The invention relates to the field of road construction, in particular to a winter asphalt pavement hot mixing and warm paving construction process which comprises the following steps: S1, construction preparation; s2, mixing and stirring materials: mixing basalt aggregate, SBS modified asphalt, a warm mixing agent and water, heating and stirring, and controlling the discharging temperature at 170-190 DEG C; s3, transporting, wherein the temperature of the asphalt mixture is not lower than 170 DEG C after the asphalt mixture is transported to a construction site; s4, paving is conducted, specifically, a traditional pavement paver is used, and an ironing plate is heated to 90 DEG C or above before construction; s5, rolling is conducted, specifically, a rubber tire type road roller is adopted for primary rolling and secondary rolling, rolling is started when a surface layer is not stuck to a wheel, the primary rolling starting temperature is 130-140 DEG C, rolling is conducted 2-3 times, the secondary rolling starting temperature is 100-110 DEG C, rolling is conducted 3-4 times, a steel wheel road roller is adopted for final rolling, the rolling starting temperature is 70-80 DEG C, and rolling is conducted 2-4 times; and S6, detecting. The compaction effect same as that of construction in a normal-temperature environment is guaranteed, and the construction time is further prolonged.
本申请涉及道路施工的领域,尤其是涉及冬季沥青路面热拌温铺施工工艺,其包括:S1,施工准备;S2,混合拌料,将玄武岩集料、SBS改性沥青、温拌剂和水混合进行加热搅拌,出料温度控制在170‑190℃;S3,运输,沥青混合料运输至施工现场后温度不低于170℃;S4,摊铺,使用传统的路面摊铺机,施工前熨平板加热至90℃以上;S5,碾压,采用橡胶轮胎式压路机进行初压和复压,在面层不粘轮时开始碾压,初压开始温度为130‑140℃,碾压2‑3遍,复压开始温度为100‑110℃,碾压3‑4遍,采用钢轮压路机进行终压,碾压开始温度为70‑80℃,碾压2‑4遍;S6,检测。本申请保证了与在常温环境下施工相同的压实效果,进一步延长了可施工时间。
Winter asphalt pavement hot mixing and warm paving construction process
The invention relates to the field of road construction, in particular to a winter asphalt pavement hot mixing and warm paving construction process which comprises the following steps: S1, construction preparation; s2, mixing and stirring materials: mixing basalt aggregate, SBS modified asphalt, a warm mixing agent and water, heating and stirring, and controlling the discharging temperature at 170-190 DEG C; s3, transporting, wherein the temperature of the asphalt mixture is not lower than 170 DEG C after the asphalt mixture is transported to a construction site; s4, paving is conducted, specifically, a traditional pavement paver is used, and an ironing plate is heated to 90 DEG C or above before construction; s5, rolling is conducted, specifically, a rubber tire type road roller is adopted for primary rolling and secondary rolling, rolling is started when a surface layer is not stuck to a wheel, the primary rolling starting temperature is 130-140 DEG C, rolling is conducted 2-3 times, the secondary rolling starting temperature is 100-110 DEG C, rolling is conducted 3-4 times, a steel wheel road roller is adopted for final rolling, the rolling starting temperature is 70-80 DEG C, and rolling is conducted 2-4 times; and S6, detecting. The compaction effect same as that of construction in a normal-temperature environment is guaranteed, and the construction time is further prolonged.
本申请涉及道路施工的领域,尤其是涉及冬季沥青路面热拌温铺施工工艺,其包括:S1,施工准备;S2,混合拌料,将玄武岩集料、SBS改性沥青、温拌剂和水混合进行加热搅拌,出料温度控制在170‑190℃;S3,运输,沥青混合料运输至施工现场后温度不低于170℃;S4,摊铺,使用传统的路面摊铺机,施工前熨平板加热至90℃以上;S5,碾压,采用橡胶轮胎式压路机进行初压和复压,在面层不粘轮时开始碾压,初压开始温度为130‑140℃,碾压2‑3遍,复压开始温度为100‑110℃,碾压3‑4遍,采用钢轮压路机进行终压,碾压开始温度为70‑80℃,碾压2‑4遍;S6,检测。本申请保证了与在常温环境下施工相同的压实效果,进一步延长了可施工时间。
Winter asphalt pavement hot mixing and warm paving construction process
冬季沥青路面热拌温铺施工工艺
DUANMU FANZHI (Autor:in) / WANG HUIRAN (Autor:in)
08.07.2022
Patent
Elektronische Ressource
Chinesisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
Mixing production process for asphalt material used for asphalt pavement paving
Europäisches Patentamt | 2020
|Foamed asphalt warm-mixing recycled pavement construction method
Europäisches Patentamt | 2022
|Asphalt pavement multi-mixture rapid paving equipment and paving construction process thereof